[1] XU J, CHEN F, TANG J. Urban rail transit driving organizational design of overtaking plan[J]. Sichuan Architecture, 2012,32(1):75-77.(徐吉庆,陈福贵,汤珏.城市轨道交通越行方案行车组织设计[J].四川建筑,2012,32(1):75-77.) [2] NÑEZ J G, de D SANZ BOBI J, RAMIREZ G, et al. A new tool for railway planning and line management[EB/OL]. [2012-10-10].http://www.witpress.com/elibrary/wit-transactions-on-the-built-environment/103/19533. [3] PENG Q. A system of making train working graph on single-track lines with computer[J]. Journal of Southwest Jiaotong University, 1995,30(5):537-542.(彭其渊.单线实用货物列车运行图计算机编制系统[J].西南交通大学学报,1995,30(5):537-542.) [4] WANG B, YANG H. Study on model and algorithm of periodic train diagram generation[J]. Journal of the China Railway Society, 2007,29(5):1-6.(汪波,杨浩.周期运行图编制模型与算法研究[J].铁道学报,2007,29(5):1-6.) [5] XU H, MA J, LONG J, et al. Study on model and method of train working diagram of urban rail transit[J]. Journal of Beijing Jiaotong University: Natural Science, 2006,30(3):10-14.(许红,马建军,龙建成,等.城市轨道交通列车运行图编制的数学模型及方法[J].北京交通大学学报:自然科学版,2006,30(3):10-14.) [6] SHI C. Analysis on use and development of train working diagram computerized drawing system[J]. Railway Transport and Economy, 2013,35(2):26-28.(史常庆.列车运行图计算机编制系统的运用与发展分析[J].铁道运输与经济,2013,35(2):26-28.) [7] GAO Z. The train diagram's designing and assessment of urban rail transit[D]. Beijing:Beijing Jiaotong University,2008.(高强周. 城市轨道交通列车运行图设计实现与评价[D].北京:北京交通大学,2008.) [8] QU M. Study on urban rail transit overtaking plan[J]. Railway Transport and Economy, 2012,34(4):79-82.(屈明月.城市轨道交通快慢车方案研究[J].铁道运输与经济,2012,34(4):79-82.) [9] PAN H. Express/slow train on urban rail transit line based on carrying capacity[J]. Urban Mass Transit, 2009(10):48-51.(潘寒川.市域轨道交通快慢车组合运营的通行能力研究[J].城市轨道交通研究,2009(10):48-51.) [10] SONG J, XU R, MIAO H. Problems of operating the express/slow train on the regional urban rail transit line[J]. Urban Mass Transit, 2006,9(12):23-27.(宋键,徐瑞华,缪和平.市域快速轨道交通线开行快慢车问题的研究[J].城市轨道交通研究,2006,9(12):23-27.) [11] SUN Y. Study and practice of operating express/slow trains on urban railway lines[J].Urban Rapid Rail Transit, 2013(2):14-17.(孙元广.市域线快慢车组合运营模式研究与实践[J].都市快轨交通,2013(2):14-17.) [12] ZHU X. Research on the metropolitan rail transit plan[D]. Chengdu: Southwest Jiaotong University,2009.(祝晓波. 市域轨道交通快速线开行方案研究[D].成都:西南交通大学,2009.) [13] CHEN X. Study on multiple-train operation mode in regional line of urban rail transit[J]. Modern Urban Transit,2010(6):50-52.(陈祥.城轨交通市域线多车种运营模式研究[J].现代城市轨道交通,2010(6):50-52.) [14] WANG F, WANG L. Setting of entrance/exist tracks of depot of urban transit system[J]. Modern Urban Transit,2006(2):36-37.(王分线,汪履直.城市轨道交通车辆段出入段线的设置[J].现代城市轨道交通,2006(2):36-37.) [15] YUAN G, LIU B. The CAD script technology in the road engineering design application[J]. China Water Transport,2007(10):55-58.(原桂海,刘标林.浅谈CAD脚本技术在道路工程设计中的运用[J],中国水运,2007(10):55-58.) |