[1] 尹超,张云,钟婷.面向新产品开发的云制造服务资源组合优选模型[J].计算机集成制造系统,2012,18(7):1368-1378. (YIN C, ZHANG Y, ZHONG T. Optimization model of cloud manufacturing services resource combination for new product development[J]. Computer Integrated Manufacturing Systems,2012,18(7):1368-1378.) [2] 景熠,王旭,李文川.供应商参与产品协同开发的任务分配优化[J].中国机械工程,2011,22(21):2566-2571. (JING Y, WANG X, LI W C. Task allocation optimization for supplier involvement in cooperative product development[J]. China Mechanical Engineering,2011,22(21):2566-2571.) [3] CHEN W-H, LIN C-S. A hybrid heuristic to solve a task allocation problem[J]. Computers & Operations Research,2000,27(3):287-303. [4] 侯亮,陈峰,温志嘉.跨企业产品协同开发中的设计任务分解与分配[J].浙江大学学报(工学版),2007,41(12):1976-1981. (HOU L, CHEN F, WEN Z J. Design task decomposition and allocation for inter-firm product collaborative development[J].Journal of Zhejiang University (Engineering Science),2007,41(12):1976-1981.) [5] 包北方,杨育,李雷霆,等.产品定制协同开发任务分配多目标优化[J].计算机集成制造系统,2014,20(4):739-746. (BAO B F, YANG Y, LI L T, et al. Multi-objective optimization for task allocation of product customization collaborative development[J]. Computer Integrated Manufacturing Systems,2014,20(4):739-746.) [6] 张婉君,刘伟,张子健.供应商参与协同产品开发中的任务指派问题研究[J].计算机集成制造系统,2009,15(6):1231-1236. (ZHANG W J, LIU W, ZHANG Z J. Task assignment for suppliers' participation in collaborative product development[J].Computer Integrated Manufacturing Systems,2009,15(6):1231-1236.) [7] 吕炎杰,赵罡,于勇.基于模糊集理论和知识相似度的复杂产品设计任务分配方法[J].计算机集成制造系统,2015,21(4):904-913. (LYU Y J, ZHAO G, YU Y. Task assignment method of complex product design based on fuzzy set theory and knowledge similarity[J]. Computer Integrated Manufacturing Systems, 2015,21(4):904-913.) [8] 武照云,刘晓霞,李丽,等.产品开发任务分配问题的多目标优化求解[J].控制与决策,2012,27(4):598-602. (WU Z Y, LIU X X, LI L, et al. Multi-objective optimization for task assignment problem of product development[J].Control and Decision,2012,27(4):598-602.) [9] 杨续昌,陈友玲,兰桂花,等.基于聚类分析和双边匹配的产品开发任务分配方法[J].计算机集成制造系统,2017,23(4):717-725. (YANG X C, CHEN Y L, LAN G H, et al. Task assignment method of product development based on clustering analysis and two-sided matching[J]. Computer Integrated Manufacturing Systems,2017,23(4):717-725.) [10] HERMERL C,KOLISCH R. Work assignment to and qualication of multi-skilled human resources under knowledge depreciation and company skilled level targets[J].International Journal of Production Research,2010,48(13):3759-3781. [11] 陈友玲,阳玮琦,刘传彪,等.基于知识相似度和学习能力的产品设计人员指派方法[J].计算机集成制造系统,2017,23(8):1700-1710. (CHEN Y L, YANG W Q, LIU C B, et al. Personnel assignment method of product design based on knowledge similarity and learning ability[J]. Computer Integrated Manufacturing Systems, 2017,23(8):1700-1710.) [12] 樊治平,乐琦.基于完全偏好序信息的严格双边匹配方法[J].管理科学学报,2014,17(1):21-34. (FAN Z P, LE Q. Strict two-sided matching method based on complete preference ordinal information[J]. Journal of Management Sciences in China,2014,17(1):21-34.) [13] 赵道致,李锐.考虑主体心理预期的云制造资源双边匹配机制[J].控制与决策,2017,32(5):871-878. (ZHAO D Z, LI R. Two-sided matching mechanism with agents' expectation for cloud manufacturing resource[J].Control and Decision,2017,32(5):871-878.) [14] 张笛,孙涛,高明美,等.多重偏好序下的复杂产品主制造商——供应商多阶段双边匹配方法[J].计算机集成制造系统,2018,24(3):804-812. (ZHANG D, SUN T, GAO M M, et al. Multi-stage two-sided matching method for main manufacturer and suppliers of complex products with multi-form preference ordinal[J]. Computer Integrated Manufacturing Systems,2018,24(3):804-812.) [15] 孙丽娜,李沈,花纯利,等.柴油机曲轴连杆组合结构动态特性分析[J].东北大学学报(自然科学版),2012,33(12):1762-1765. (SUN L N, LI S, HUA C L, et al. Dynamic Characteristics of crankshaft-connecting rod of diesel engine[J].Journal of Northeastern University (Natural Science), 2012,33(12):1762-1765.) [16] WANG T. Research on the conflict resolution method in uncertainty task allocation[J]. Journal of Information & Computational Science,2015,12(15):5769-5775. [17] 沈磊,郭钢,罗妤.大科学装置建造复杂资源管理模型[J].计算机集成制造系统,2013,19(8):2075-2082. (SHEN L, GUO G, LUO S. Complex resource management model for large scientific device construction[J].Computer Integrated Manufacturing Systems,2013,19(8):2075-2082. |