[1]VALLS V, BALLESTIN F, QUINTANILLA S. Justification and RCPSP: a technique that pays [J]. European Journal of Operational Research, 2005, 165(2): 375-386.
[2]KOLISCH R, HARTMANN S. Experimental investigation of heuristics for resource-constrained project scheduling: an update [J]. European Journal of Operational Research, 2006, 174(1): 23-37.
[3]WANG H, LIN D, LI M. Genetic algorithm for multi-objective resource-constrained project scheduling problem [J]. Computer Engineering and Applications, 2008, 44(7): 1-4. (王宏,林丹,李敏强.一种求解多目标资源受限项目调度的遗传算法[J].计算机工程与应用,2008,44(7):1-4.)
[4]MERKLE D, MIDDENDORF M, SCHMECK H. Ant colony optimization for resource-constrained project scheduling [J]. IEEE Transactions on Evolutionary Computation, 2002, 6(4): 333-346.
[5]YU X, ZHAN D, NIE L. Genetic simulated annealing algorithm for resource-constrained project scheduling problem [J]. Computer Engineering and Applications, 2009, 45(24): 17-20. (喻小光,战德臣,聂兰顺.应用遗传模拟退火算法实现资源受限项目调度[J].计算机工程与应用,2009,45(24):17-20.)
[6]WANG W, ZHAO G. Particle swarm optimization for resource-constrained project scheduling problem[J]. Journal of Harbin Institute of Technology, 2007, 39(4): 669-672. (王巍,赵国杰.粒子群优化在资源受限工程调度问题中的应用[J].哈尔滨工业大学学报,2007,39(4):669-672.)
[7]KENNEDY J, EBERHART R C. Particle swarm optimization [C]// Proceedings of the 1995 IEEE International Conference on Neural Networks. Piscataway: IEEE Press, 1995: 1942-1948.
[8]CAPONETTO R, FORTUNA L, FAZZINO S. Sequences to improve the performance of evolutionary algorithms [J]. IEEE Transactions on Evolutionary Computation, 2003, 7(3): 289-304.
[9]CLERC M, KENNEDY J. The particle swarm: explosion, stability, and convergence in a multi-dimensional complex space [J]. IEEE Transactions on Evolutionary Computation, 2002, 6(1):58-73.
[10]TANG J, DAI Y. Regional shock search embedded particle swarm optimization algorithm [J]. Computer Engineering and Applications, 2013, 49(21): 33-36. (汤继涛,戴月明.内嵌区域震荡搜索的粒子群优化算法[J].计算机工程与应用,2013,49(21):33-36.)
[11]ZHANG K, ZHAO G, JIANG J. Particle swarm optimization method for resource-constrained project scheduling problem [C]// ICEMI 2009: Proceedings of the Ninth International Conference on Electronic Measurement & Instruments. Piscataway: IEEE Press, 2009: 792-796.
[12]XIE Y, YE C, CHEN J, et al. Resource-constrained project scheduling based on chaos particle swarm optimization [J]. Industrial Engineering Journal, 2012, 15(3): 57-61.(谢阳,叶春明,陈君兰,等.基于混沌粒子群的资源受限项目调度问题[J].工业工程,2012,15(3):57-61.)
[13]NI L, DUAN C, ZHONG H. Multi-project scheduling based on simulated harmonic oscillator algorithm [J]. , 2011, 31(9): 2559-2562.(倪霖,段超,钟辉.基于模拟谐振子算法的多项目调度[J].计算机应用,2011,31(9):2559-2562.) |