[1]LI H, WANG S, LIU C, et al.Software reliability model considering both testing effort and testing coverage [J]. Journal of Software, 2013,24(4):749-760.(李海峰,王栓奇,刘畅,等.考虑测试工作量与覆盖率的软件可靠性模型[J].软件学报,2013,24(4):749-760.)
[2]LIU X. Handbook of software reliability engineering [M]. Beijing: Publishing House of Electronics Industry, 1997.(刘喜成.软件可靠性工程手册[M].北京:电子工业出版社,1997.)[3]LIU L, GUO L, XIAO H, et al.Software reliability growth model based on dynamic fuzzy neural network with parameters dynamic adjustment [J]. Computer Science, 2013,40(2):186-190.(刘逻,郭立红,肖辉,等.基于参数动态调整的动态模糊神经网络的软件可靠性增长模型[J].计算机科学,2013,40(2):186-190.)
[4]LIU L, GUO L, XIAO H, et al.Software reliability growth model based on SAA-DFNN [J]. Journal of Jilin University: Engineering and Technology Edition, 2012,42(9):1225-1230.(刘逻,郭立红,肖辉,等.基于结合模拟退火算法的动态模糊神经网络的软件可靠性增长模型[J].吉林大学学报:工学版,2012,42(9):1225-1230.)
[5]CHEN X, LI D, XU Z, et al.Adaptive control of quadrotor MAV using interval type-Ⅱ fuzzy neural network [J]. Optics and Precision Engineering, 2012,20(6):1334-1341.(陈向坚,李迪,续志军,等.四旋翼微型飞行器的区间二型模糊神经网络自适应控制[J].光学精密工程,2012,20(6):1334-1341.)
[6]LI D, CHEN X, XU Z. Gain adaptive sliding mode controller for flight attitude control of MAV [J]. Optics and Precision Engineering, 2013,21(5):1183-1191.(李迪,陈向坚,续志军.增益自适应滑模控制器在微型飞行器飞行姿态控制中的应用 [J].光学精密工程,2013,21(5):1183-1191.)
[7]SHI B, LI Y, YU X, et al.Short-term load forecasting based on modified particle swarm optimizer and fuzzy neural network model [J]. Systems Engineering—Theory and Practice, 2010,30(1):157-166.(师彪,李郁侠,于新花,等.基于改进粒子群〖CD*2〗模糊神经网络的短期电力负荷预测[J].系统工程理论与实践,2010,30(1):157-166.)
[8]BHARGAVA V, FATEEN S E K, BONILLA-PETRICIOLET A. Cuckoo search: a new nature-inspired optimization method for phase equilibrium calculations [J]. Fluid Phase Equilibira, 2013,337:191-200.
[9]KANAGARAJ G, PONNAMBALAM S G, JAWAHAR N. A hybrid cuckoo search and genetic algorithm for reliability-redundancy allocation problems [J]. Computers and Industrial Engineering, 2013,66:1115 -1124.
[10]YANG X S, DEB S. Multiobjective cuckoo search for design optimization [J]. Computers and Operations Research, 2013,40:1616-1624.
[11]ZHENG H, ZHOU Y. Self-adaptive step cuckoo search algorithm [J]. Computer Engineering and Applications, 2013,49(10):68-71.(郑洪清,周永权.一种自适应步长布谷鸟搜索算法[J].计算机工程与应用,2013,49(10):68-71.)
[12]CHANG Y, LIU C. A generalized JM model with applications to imperfect debugging in software reliability [J]. Applied Mathematical Modelling, 2009,33(9):3579-3588.
[13]CHIU K C, HUANG Y S, LEE T Z, et al.A study of software reliability growth from the perspective of learning effects [J]. Reliability Engineering and System Safety, 2008,93:1410-1421. |