[1] 韩骏,孙晓娜,靳志宏.集装箱码头泊位与岸桥协调调度优化[J].大连海事大学学报(自然科学版),2008,34(2):117-121. (HAN J, SUN X N, JIN Z H. Coordinated optimization method for berth and quay crane allocation in container terminal[J]. Journal of Dalian Maritime University (Natural Science Edition), 2008, 34(2):117-121.) [2] 谭盛强,朱瑾.基于混合算法的多目标连续泊位-岸桥集成调度研究[J].宁夏大学学报(自然科学版),2015,36(2):131-139. (TAN S Q, ZHU J. Study of multi-objective consecutive berth integrated scheduling of quay based on hybrid algorithm[J]. Journal of Ningxia University (Natural Science Edition), 2015, 36(2):131-139.) [3] 李明伟,康海贵,耿静,等.基于多目标混沌云粒子群算法的泊位-岸桥分配研究[J].水运工程,2014(1):90-96. (LI M W, KANG H G, GENG J, et al. Berth and quay-crane allocation based on multi-objective chaos cloud particle swarm optimization algorithm[J]. Port & Waterway Engineering, 2014(1):90-96.) [4] MEISEL F, BIERWIRTH C. Heuristics for the integration of crane productivity in the berth allocation problem[J]. Transportation Research Part E:Logistics and Transportation Review, 2009, 45(1):196-209. [5] ZHANG C, ZHENG L, ZHANG Z, et al. The allocation of berths and quay cranes by using a sub-gradient optimization technique[J]. Computers & Industrial Engineering, 2010, 58(1):40-50. [6] HE J. Berth allocation and quay crane assignment in a container terminal for the trade-off between time-saving and energy-saving[J]. Advanced Engineering Informatics, 2016, 30(3):390-405. [7] KARAM A, ELTAWIL A B. A new method for allocating berths, quay cranes and internal trucks in container terminals[C]//Proceedings of the 2015 International Conference on Logistics, Informatics and Service Sciences. Piscataway, NJ:IEEE, 2015:1-6. [8] BIERWIRTH C, MEISEL F. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals[J]. European Journal of Operational Research, 2015, 244(3):675-689. [9] IMAI A, CHEN H C, NISHIMURA E, et al. The simultaneous berth and quay crane allocation problem[J]. Transportation Research Part E Logistics & Transportation Review, 2008, 44(5):900-920. [10] LEE D, WANG H Q. Integrated discrete berth allocation and quay crane scheduling in port container terminals[J]. Engineering Optimization, 2010, 42(8):747-761. [11] 毕娅,李文锋.集装箱港口集群下多港口多泊位联合调度方法[J].计算机应用,2012,32(2):448-451. (BI Y, LI W F. Multi-port and multi-berth integrated scheduling based on container port cluster[J]. Journal of Computer Applications, 2012, 32(2):448-451.) [12] 张红菊,乐美龙.基于多目标粒子群算法的泊位-岸桥分配研究[J].武汉理工大学学报,2012,34(2):59-64. (ZHANG H J, LE M L. Research on container berth-quay crane allocation based on multi-objective PSO[J]. Journal of Wuhan University of Technology, 2012, 34(2):59-64.) [13] SAMMARRA M, CORDEAU J F, LAPORTE G, et al. A tabu search heuristic for the quay crane scheduling problem[J]. Journal of Scheduling, 2007, 10(4):327-336. [14] YANG C Y, CAI W. Extenics Theory, Method and Application[M]. Beijing:Science Press, 2013:87-105. [15] 杨春燕,蔡文.可拓集中关联函数的研究进展[J].广东工业大学学报,2012,29(2):7-14. (YANG C Y, CAI W. Recent research progress in dependent functions in extension sets[J]. Journal of Guangdong University of Technology, 2012, 29(2):7-14.) [16] 蒋大培,胡志华,胡少龙.考虑偏好泊位的泊位和岸桥集成分派问题[J].广西大学学报(自然科学版),2014,39(3):663-672.(JIANG D P, HU Z H, HU S L. Berth-crane allocation problem based on the preferences of berthing position[J]. Journal of Guangxi University (Natural Science Edition), 2014, 39(3):663-672.) [17] 乐美龙,刘秀玲.基于泊位偏好与服务优先级的泊位和岸桥分配[J].辽宁工程技术大学学报(自然科学版),2013,32(5):709-712. (LE M L, LIU X L. Berth and quay crane allocation based on berth preference and service priority[J]. Journal of Liaoning Technical University (Natural Science), 2013, 32(5):709-712.) |