[1] NASIRI M M, KIANFAR F. A GES/TS algorithm for the job shop scheduling [J]. Computers & Industrial Engineering, 2012, 62(4): 946-952. [2] BRUCKER P, SCHLIE R. Job-shop scheduling with multi-purpose machines [J]. Computing, 1990, 45(4): 369-375. [3] GU F. Optimization algorithm research for flexible job shop scheduling [D]. Hefei: University of Science and Technology of China, 2006.(谷峰.柔性作业车间调度中的优化算法研究[D].合肥:中国科学技术大学,2006.) [4] ZHOU G. Research on flexible scheduling problems based on artificial bee colony algorithm [D]. Beijing: Tsinghua University, 2012.(周刚.基于人工蜂群算法的柔性调度问题研究[D].北京:清华大学,2012.) [5] FANG S, YAO Y, ZHAO S. Improved genetic algorithm for flexible job shop scheduling [J]. Journal of Zhejiang University: Engineering Science, 2012, 46(4): 629-635.(方水良,姚嫣菲,赵诗奎.柔性车间调度的改进遗传算法[J].浙江大学学报:工学版,2012,46(4):629-635.) [6] XUE H, WEI S, ZHANG P, et al. Flexible job-shop scheduling based on multiple ant colony algorithm [J]. Computer Engineering and Applications, 2013, 49(24): 243-248.(薛宏全,魏生民,张鹏,等.基于多种群蚁群算法的柔性作业车间调度研究[J].计算机工程与应用,2013,49(24):243-248.) [7] JIA Z. Application and research on particle swarm optimization algorithm in flexible job shop scheduling problems [D]. Heifei: University of Science and Technology of China, 2008.(贾兆红.粒子群优化算法在柔性作业车间调度中的应用研究[D].合肥:中国科学技术大学,2008.) [8] PAN F, YE C, YANG J. Flexible job-shop scheduling problem under uncertainty based on QPSO algorithm [J]. Advanced Materials Research, 2013, 605/606/607: 487-492. [9] SONG C. Co-evolution particle swarm optimization algorithm for flexible job-shop scheduling problem [J]. Computer Engineering and Applications, 2013, 49(21): 15-18.(宋存利.求解柔性作业调度问题的协同进化粒子群算法[J].计算机工程与应用,2013,49(21):15-18.) [10] LI L. Particle swarm optimization algorithm with self-adaptive parameter and chaos search for solving flexible job shop scheduling problem [J]. Journal of Computer and Applications, 2012, 32(7): 1932-1934.(李莉.基于自适应参数与混沌搜索的PSO算法求解柔性作业车间调度问题[J].计算机应用,2012,32(7):1932-1934.) [11] CHEN C. Two-layer particle swarm optimization for unconstrained optimization problems [J]. Applied Soft Computing, 2011, 11(1): 295-304. [12] HO N B, TAY J C, LAI E M K. An effective architecture for learning and evolving flexible job-shop schedules [J]. European Journal of Operational Research, 2007, 179(2): 316-333. [13] LI L. Research on swarm intelligent optimization algorithm for flexible job shop scheduling [D]. Harbin: Northeast Forestry University, 2011.(李莉.柔性作业车间调度中的群智能优化算法研究[D].哈尔滨:东北林业大学,2011.) [14] DEMIR Y, KÜR ŞAT IŞLEYEN S. Evaluation of mathematical models for flexible job-shop scheduling problems [J]. Applied Mathematical Modelling, 2013, 37(3): 977-988. [15] KENNEDY J, EBERHART R. Particle swarm optimization [C]//Proceedings of the 1995 IEEE International Conference on Neural Networks. Piscataway: IEEE, 1995: 1942-1948. [16] LIM W H, MAT ISA N A. An adaptive two-layer particle swarm optimization with elitist learning strategy [J]. Information Sciences, 2014, 273: 49-72. [17] CHEN G, JIA J, HAN Q. Study on the strategy of decreasing inertia weight in particle swarm optimization algorithm [J]. Journal of Xi'an Jiaotong University, 2006, 40(1): 53-56.(陈贵敏,贾建援,韩琪.粒子群优化算法的惯性权值递减策略研究[J].西安交通大学学报,2006,40(1):53-56.) |