[1]GILBO E P.Airport capacity:representation,estimation,optimization [J].IEEE Transactions on Control Systems Technology,1993,1(3):144-154.[2]胡明华,刘松,苏兰根.基于统计分析的单跑道容量估计模型研究[J].数据采集与处理,2000,15(1):74-77.[3]NEUFVILLE R D,ODONI A R.Airport systems planning,designs,and management[M].New York:McGraw-Hill,2002.[4]余江,蒲云.跑道容量的概率模型及容量曲线[J].交通运输工程学报,2002,2(4):99-102.[5]陈勇,曹义华,周勇.北京首都国际机场容量评估研究[J].飞行力学,2005,23(4):86-89.[6]郭海琦,朱金福.近距平行跑道容量及延误水平计算模型[J].交通运输工程学报,2008,8(4):68-72.[7]陈欣.机场空侧容量评估与优化方法研究[D].南京:南京航空航天大学,2007.[8]WANG CHAO,ZHANG XINYUE,XU XIAOHAO.Simulation study on airfield system capacity analysis using SIMMOD[C]// 2008 International Symposium on Computational Intelligence and Design.Piscataway,NJ:IEEE Press,2008:87-90.[9]GAO WEI,JIANG SIYUAN.Simulation study on closely spaced parallel runway analysis using SIMMOD plus[C]// Proceedings of the 2010 International Conference on Intelligent Computation Technology and Automation.Piscataway,NJ:IEEE Press,2010:344-347.[10]高伟,黄朝伟.重庆机场终端区容量评估的仿真研究[J].中国民航大学学报,2010,28(5):1-4.[11]鱼海洋,胡华清,姚津津.机场航空容量评估的计算机仿真方法[J].空中交通管理,2009(2):21-25.[12]HUANG A S,SCHLEICHER D,HUNTER G.Future flight demand generation tool[C]// Proceedings of AIAA the 4th Aviation Technology,Integration and Operations (ATIO) Forum.Chicago:AIAA,2004:6400.[13]李凯.近距平行进近研究[D].南京:南京航空航天大学,2005.[14]顾正兵.虹桥机场近距平行跑道仪表运行方式研究[J].中国民航大学学报,2010,28(5):21-24.[15]李浩瀚.飞行区容量研究综述[J].中国科技信息,2009(3):36-39. |