[1] AVARAMOVIC Z Z. Method for evaluating the strength of retarding steps on a marshalling yard hump[J]. European Journal of Operational Research, 1995,85(3):504-514. [2] TURNQUIST M A, DASKIN M S. Queuing models of classification and connection delay in rail yards[J]. Transportation Science, 1982,16(2):207-230. [3] LENTINK R M, FIOOLE P-J, KROON L G, et al. Applying operations research techniques to planning train shunting[M]//Planning in Intelligent Systems: Aspects, Motivations, and Methods. Hoboken: John Wiley and Sons, 2006:415-437. [4] WANG C. Transportation model and optimization[M]. Beijing: China Railway Publishing House, 2004:57-58.(王慈光.运输模型及优化[M]. 北京:中国铁道出版社,2004:57-58.) [5] XUE F. Collabrative optimization model and algorithm for wagon-flow allocation in railway marshaling station[J]. Systems Engineering-Theory and Practice, 2013,33(11):2930-2936.(薛锋.铁路编组站配流协同优化模型与算法[J].系统工程理论与实践,2013,33(11):2930-2936.) [6] XUE F, WANG C. The adjustment method for train classification sequence in marshalling station[J]. Journal of the China Railway Society, 2007,29(4):1-5.(薛锋,王慈光.编组站列车编组顺序的调整方法[J].铁道学报,2007,29(4):1-5.) [7] PENG Q, ZHAO J. Adjustment method for train break-up and make-up sequence in railway technical station[J]. Journal of Southwest Jiaotong University, 2009,44(3):385-391.(彭其渊,赵军.技术站列车解编顺序的调整方法[J].西南交通大学学报,2009,44(3):385-391.) [8] LI H, HE S, JING Y. Wagon-flow allocation optimization of stage plan at marshaling station in consideration of different size limitations of departure trains[J]. Journal of the China Railway Society, 2012,34(7):10-17.(李浩东,何世伟,景云.考虑不同满轴约束的编组站阶段计划配流优化[J].铁道学报,2012,34(7):10-17.) [9] DUAN H. Principle and application of ant colony algorithm[M]. Beijing: Science Press, 2005:24-98.(段海滨. 蚁群算法原理及其应用[M]. 北京:科学出版社, 2005:24-98.) [10] YAN Z. Methods of multi-objective programming[J]. Journal of Beijing Agricultural Engineering University, 1988,8(2):108-116.(严祖梁.多目标规划方法综述[J].北京农业工程大学学报,1988,8(2):108-116.) [11] HE Y, ZHANG H, MAO B, et al. Multiobjective bi-level programming model of making train working plan for passenger-only line[J]. Journal of the China Railway Society, 2006,28(5):6-10.(何宇强,张好智,毛保华,等.客运专线旅客列车开行方案的多目标双层规划模型[J].铁道学报,2006,28(5):6-10.) [12] MANIEZZO V, CARBONARO A. An ANTS heuristic for the frequency assignment problem[J]. Future Generation Computer Systems, 2000,16(8):927-935. |