[1] 冯烽.我国能源消耗与二氧化碳排放的特征及其变化[J].经济研究参考,2015(19):23-31.(FENG F. Characteristics and changes of energy consumption and carbon dioxide emission in China[J]. Review of Economic Research, 2015(19):23-31.) [2] "中国工程院绿色制造发展战略研究"课题组.推进绿色制造建设生态文明——中国绿色制造战略研究[J].中国工程科学,2017,19(3):53-60.(The Research Group for Research on Green Manufacturing Strategy. Advancing green manufacturing for ecological civilization:research on green manufacturing strategies in China[J]. Chinese Engineering Science, 2017,19(3):53-60.) [3] 王凌,王晶晶,吴楚格.绿色车间调度优化研究进展[J].控制与决策,2018,33(3):385-391.(WANG L, WANG J J, WU C G. Advances in green shop scheduling and optimization[J]. Control and Decision,2018,33(3):385-391.) [4] 李玉霞,曹华军,李洪丞,等.作业车间碳排放动态特性及二阶优化调度模型[J].计算机集成制造系统,2015,21(10):2687-2893.(LI Y X, CAO H J, LI H C, et al. Carbon emissions dynamic characteristic and two stage optimization scheduling model for job shop[J]. Computer Integrated Manufacturing Systems, 2015, 21(10):2687-2693.) [5] ADEKOLA O, STAMP J D, MAJOZI T, et al. Unified approach for the optimization of energy and water in multipurpose batch plants using a flexible scheduling framework[J]. Industrial and Engineering Chemistry Research, 2013, 52(25):8488-8506. [6] CAPÓN-GARCÍA E, BOJARSKI A D, ESPUNA A, et al. Multiobjective optimization of multiproduct batch plants scheduling under environmental and economic concerns[J]. AIChE Journal, 2011, 57(10):2766-2782. [7] DING J, SONG S, ZHANG R, et al. Parallel machine scheduling under time-of-use electricity prices:new models and optimization approaches[J]. IEEE Transactions on Automation Science and Engineering, 2016, 13(2):1138-1154. [8] 朱伟.基于规则导向的柔性作业车间多目标动态调度算法[J].系统工程理论与实践,2017,37(10):2690-2699.(ZHU W. Multi-objective dynamic scheduling algorithm for flexible job-shop problem based on rule orientation[J]. Systems Engineering-Theory and Practice, 2017, 37(10):2690-2699.) [9] GONG X, DENG Q, GONG G, et al. A memetic algorithm for multi-objective flexible job-shop problem with worker flexibility[J]. International Journal of Production Research, 2018, 56(7):2506-2522. [10] ZHENG X, WANG L. A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem[J]. International Journal of Production Research, 2016, 54(18):5554-5566. [11] MEZIANI N, BOUDHAR M, OULAMARA A. PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations[J]. European Journal of Industrial Engineering, 2018, 12(1):43-66. [12] 李小缤,白焰,耿林霄.求解置换流水车间调度问题的改进遗传算法[J].计算机应用,2013,33(12):3576-3579.(LI X B, BAI Y, GENG L X. Improved genetic algorithm for solving permutation flow shop scheduling problem[J]. Journal of Computer Applications, 2013, 33(12):3576-3579.) [13] AKRAM K,KAMAL K,ZEB A. Fast simulated annealing hybridized with quenching for solving job shop scheduling problem[J]. Applied Soft Computing Journal, 2016(49):510-523. [14] 施金良,刘飞,许弟建,等.数控机床空载运行时节能决策模型及实用方法[J].中国机械工程,2009,20(11):1344-1346.(SHI J L,LIU F,XU D J, et al. Decision model and practical method of energy-saving in NC machine tool[J]. China Mechanical Engineering, 2009,20(11):1344-1346.) [15] HOLLAND J H. Adaptation in Natural and Artificial Systems[M]. Michigan:University of Michigan Press, 1992:117-121. [16] 王凌.智能优化算法及其应用[M].北京:清华大学出版社, 2001:33-35.(WANG L. Intelligent Optimization Algorithms with Applications[M]. Beijing:Tsinghua University Press, 2001:33-35.) [17] 雷德明.多维实数编码遗传算法[J].控制与决策,2000,15(2):239-241.(LEI D M. Multidimensional real coding genetic algorithm[J]. Control and Decision, 2000, 15(2):239-241.) [18] 程鹏,金飞翔,邵晨曦,等.基于正交试验的铝合金覆盖件模面优化[J].汽车工程,2019,41(1):96-102.(CHENG P, JIN F X, SHAO C X, et al. Optimization of die face for aluminum alloy closure panel based on orthogonal experiment[J]. Automotive Engineering, 2019,41(1):96-102. [19] 张超勇,饶运清,李培根,等.柔性作业车间调度问题的两级遗传算法[J].机械工程学报,2007,43(4):119-124.(ZHANG C Y, RAO Y Q, LI P G, et al. Bilevel genetic algorithm for the flexible job-shop scheduling problem[J]. Chinese Journal of Mechanical Engineering, 2007, 43(4):119-124.) [20] ZHANG H P, GEN M. Multistage-based genetic algorithm for flexible job-shop scheduling problem[J]. Complexity International, 2005(11):223-232. [21] 田旻,刘人境.分层混合遗传算法求解柔性作业车间调度问题[J].工业工程与管理,2017(5):32-39.(TIAN M,LIU R J. Solving flexible job-shop scheduling problem based on hierarchical hybrid genetic algorithm[J]. Industrial Engineering and Management, 2017(5):32-39.) [22] ZIAEE M. A heuristic algorithm for solving flexible job shop scheduling problem[J]. International Journal of Advanced Manufacturing Technology, 2014, 71(1/2/3/4):519-528. [23] 夏俊红,郑建国.基于改进GSO算法的柔性作业车间E/T调度问题[J].计算机系统应用,2019,28(1):119-126.(XIA J H, ZHENG J G. Flexible job shop scheduling based on improved glowworm swarm optimization[J]. Computer Systems and Applications, 2019, 28(1):119-126.) [24] 吴秀丽,孙阳君.机器多转速的柔性作业车间绿色调度问题[J].计算机集成制造系统,2018,24(4):862-875.(WU X L, SUN Y J. Flexible job shop green scheduling problem with multi-speed machine[J]. Computer Integrated Manufacturing Systems, 2018, 24(4):862-875.) [25] 陈兆龙,刘兆增.改变设备现状降低设备能耗[J].中国设备工程,2008(11):20-21.(CHEN Z L, LIU Z Z. Change equipment status Reduce equipment energy consumption[J]. Chinese Equipment Engineering,2008(11):20-21.) |