[1] KIM K H, PARK Y-M. A crane scheduling method for port container terminals [J]. European Journal of Operational Research, 2004, 156 (3): 752-768. [2] MOCCIA L, CORDEAU J F, GAUDIOSO M, et al. A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal [J]. Naval Research Logistics, 2006, 53 (1): 45-59. [3] BIERWIRTH C, MEISEL F. A fast heuristic for quay crane scheduling with interference constraints [J]. Journal of Scheduling, 2009, 12(4): 345-360. [4] NATHAN N. An efficient genetic algorithm for solving the quay crane scheduling problem [J]. Expert Systems with Applications, 2012, 39 (2): 13108-13117. [5] MEISEL F, BIERWIRTH C. A unified approach for the evaluation of quay crane scheduling models and algorithms [J]. Computers & Operations Research, 2011, 38(3): 683-693. [6] LEGATO P, TRUNFIO R, MEISEL F. Modeling and solving rich quay crane scheduling problems [J]. Computers & Operations Research, 2012, 39(9): 2063-2078. [7] LE M, ZHAO Y, LIU X. Shore-mounted gantry crane scheduling for single vessel under time window-using mathematical programming and rule heuristic algorithm [J]. Computer Engineering and Applications, 2014, 50(9): 242-248.(乐美龙,赵彦营,刘秀玲.时间窗下单船岸桥调度——基于数学规划和规则的启发式算法[J].计算机工程与应用,2014,50(9):242-248.) [8] MEISEL F. The Quay crane scheduling problem with time windows [J]. Naval Research Logistics, 2011, 58(7): 619-636. [9] LEGATO P, MAZZA R M, TRUNFIO R. Simulation-based optimization for discharge/loading operations at a maritime container terminal [J]. OR Spectrum, 2010, 32(3): 543-67. [10] CHUNG S H, CHOY K L. A modified genetic algorithm for quay crane scheduling operations [J]. Expert Systems with Applications, 2012, 39(4): 4213-4221. [11] SU N, ZHANG M, JOHNSTON M, et al. Hybrid evolutionary computation methods for quay crane scheduling problems [J]. Computers & Operations Research, 2013, 40(8): 2083-2093. [12] LU Z, HAN X, XI L, et al. A heuristic for the quay crane scheduling problem based on contiguous bay crane operations [J]. Computers & Operations Research, 2012, 39(12): 2915-2928. [13] CHEN J, LEE D-H, CAO J. Heuristics for quay crane scheduling at indented berth [J]. Transportation Research Part E: Logistics and Transportation Review, 2011, 47(6): 1005-1020. [14] FAN Z, LE M. A genetic algorithm to minimize the makespan and waiting time for the bi-objective quay crane scheduling problem [J]. Journal of Systems and Management, 2013, 22(1): 120-127.(范志强,乐美龙.最小化最大完工时间与等待时间的岸桥作业调度双目标优化及其遗传算法[J].系统管理学报,2013,22(1):120-127.) [15] DIABAT A, THEODOROU E. An integrated quay crane assign-ment and scheduling problem [J]. Computers & Industrial Engineering, 2014, 73: 115-123. [16] CAI G, DONG E. Comparison and analysis of generation algorithm and ant colony optimization on TSP [J]. Computer Engineering and Applications, 2007, 43(10): 96-98.(蔡光跃,董恩清.遗传算法和蚁群算法在求解TSP问题上的对比分析[J].计算机工程与应用,2007,43(10):96-98.) |