[1]ZPFEL G, BGL M. Multi-period vehicle routing and crew scheduling with outsourcing options [J]. International Journal of Production Economics, 2008,113(2):980-996.
[2]OKELLY M E. A quadratic integer program for the location of interacting hub facilities [J]. European Journal of Operational Research, 1987,32(3):393-404.[3]OKELLY M E. Rectilinear minimax hub location [J]. Journal of Geographical Systems, 2009,11(3):227-241.
[4]MEYER T, ERNST A T, KRISHNAMOORTHY M. A 2-phase algorithm for solving the single allocation p-hub center problem [J]. Computers and Operations Research, 2009,36(12):3143-3151.
[5]LIN C-C. The integrated secondary route network design model in the hierarchical hub-and-spoke network for dual express services [J]. International Journal of Production Economics, 2010,123(1):20-30.
[6]ALUMUR S, KARA B Y. Network hub location problems: the state of the art [J]. European Journal of Operational Research, 2008,190(1):1-21.
[7]ISHFAQ R, SOX C R. Hub location-allocation in intermodal logistic networks [J]. European Journal of Operational Research, 2011,210(2):213-230.
[8]GELAREH S, NICKEL S, PISINGER D. Liner shipping hub network design in a competitive environment [J]. Transportation Research Part E: Logistics and Transportation Review, 2010,46(6):991-1004.
[9]de CAMARGO R S, MIRANDA G, FERREIRA R P M, et al.〖WTBZ〗 Multiple allocation hub-and-spoke network design under hub congestion [J]. Computers and Operations Research, 2009,36(12):3097-3106.
[10]ISHFAQ R, SOX C R. Design of intermodal logistics networks with hub delays [J]. European Journal of Operational Research, 2012,220(3):629-641.
[11]CORREIA I, NICKEL S, SALDANHA-DA-GAMA F. Hub and spoke network design with single-assignment, capacity decisions and balancing requirements [J]. Applied Mathematical Modelling, 2011,35(10):4841-4851.
[12]ALUMUR S A, KARA B Y, KARASAN O E. Multimodal hub location and hub network design [J]. Omega, 2012,40(6):927-939.
[13]ALUMUR S A, NICKEL S, SALDANHA-DA-GAMA F. Hub location under uncertainty [J]. Transportation Research Part B: Methodological, 2012,46(4):529-543.
[14]LU H, YU X, BIAN C. Model and algorithm of discrete network design problem under OD demand uncertainty [J]. Journal of Highway and Transportation Research and Devedopment, 2011,28(5):128-132.(陆化普,蔚欣欣,卞长志.OD需求不确定的离散交通网络设计模型研究[J].公路交通科技,2011,28(5):128-132.)
[15]HU Q, HU Z, TAO S. Resource balanced usage problem for bi-level hub-and-spoke LTL logistics network design [J]. Journal of Highway and Transportation Research and Development, 2013,30(4):124-131.(胡青蜜, 胡志华, 陶莎.二级轴辐式零担物流网络设计的资源均衡利用问题[J]. 公路交通科技,2013,30(4):124-131.)
[16]LIN C-C, LIN J-Y, CHEN Y-C. The capacitated p-hub median problem with integral constraints: an application to a Chinese air cargo network [J]. Applied Mathematical Modelling, 2012,36(6):2777-2787.
[17]QlU R, HUANG X. A robust supply chain coordination model based on minimax regret criterion [J]. Journal of Systems and Management, 2011,20(3):296-301.(邱若臻,黄小原.基于最小最大后悔值准则的供应链鲁棒协调模型[J].系统管理学报,2011,20(3):296-301.) |