[1] HAGHANI A, OH S. Formulation and solution of a multi-commodity, multi-model network flow model for disaster relief operations[J]. Transportation Research Part A, 1996, 30(3):231-250. [2] FIEDRICH F, GEHBAUER F, RICKERS U. Optimized resource allocation for emergency response after earthquake disasters[J]. Safety Science, 2000, 35(1):41-57. [3] RAJRGOPALAN H, SAYDAM C, XIAO J. A multiperiod set covering location model for dynamic redeployment of ambulances[J]. Computers and Operations Research, 2008, 35(3):814-826. [4] WOHLGEMUTH S, OLORUNTOBA R, CLAUSEN U. Dynamic vehicle routing with anticipation in disaster relief[J]. Socio-Economic Planning Sciences, 2012, 46(4):261-271. [5] 李建斌.高速公路突发事件紧急救援关键技术研究[D].西安:长安大学,2012:101-121.(LI J B. Research on key technology of freeway incident emergency respond[D]. Xi'an:Chang'an University, 2012:101-121.) [6] 杨继君,佘廉.面向多灾点需求的应急资源调度博弈模型及优化[J].中国管理科学,2016,24(8):154-163.(YANG J J, SHE L. Game model and optimization based on resource requirements of multiple crisis locations[J]. Chinese Journal of Management Science, 2016, 24(8):154-163.) [7] 汪勇,金菲.应急资源调度问题的改进进化规划算法研究[J].运筹与管理,2012,21(4):29-33.(WANG Y, JIN F. Research on improved evolutionary programming algorithm for solving the problem of emergency resources scheduling[J]. Operations Research and Management Science, 2012, 21(4):29-33.) [8] 张卫华,谢晓琳,缪子英,等.资源共享条件下高速公路应急救援资源调度方法[J].中国安全科学学报,2014,24(5):170-176.(ZHANG W H, XIE X L, MIAO Z Y, et al. Method of scheduling expressway emergency rescue resource under condition of resources sharing[J]. China Safety Science Journal, 2014, 24(5):170-176.) [9] ZHOU Y, LIU J, ZHANG Y, et al. A multi-objective evolutionary algorithm for multi-period dynamic emergency resource scheduling problems[J]. Transportation Research Part E:Logistics and Transportation Review, 2017, 99:77-95. [10] SU Z, ZHANG G, LIU Y, et al. Multiple emergency resource allocation for concurrent incidents in natural disasters[J]. International Journal of Disaster Risk Reduction, 2016, 17:199-212. [11] NAJAFI M, ESHGHI K, DULLAERT W. A multi-objective robust optimization model for logistics planning in the earthquake response phase[J]. Transportation Research Part E:Logistics and Transportation Review, 2013, 49(1):217-249. [12] 张海龙.应急管理关键问题研究[D].长春:吉林大学,2010:56-59.(ZHANG H L. Research on key problems of emergency management[D]. Changchun:Jilin University, 2010:56-59.) [13] 高虹霓,赵一兵,李宁.基于多需求点的震灾应急物资调度模型研究[J].中国安全科学学报,2013,23(1):161-165.(GAO H N, ZHAO Y B, LI N. Study on model for emergency materials dispatching of earthquake disaster based on multi-demand centers[J]. China Safety Science Journal, 2013, 23(1):161-165.) [14] 黄德启.面向区域路网的应急资源布局与调度方法研究[D].武汉:武汉理工大学,2012:41-42.(HUANG D Q. Research on emergency resources layout and scheduling method for the regional road network[D]. Wuhan:Wuhan University of Technology, 2012:41-42.) [15] 田志强,宋琦,潘金山,等.铁路突发事件应急救援设备调度优化研究[J].铁道科学与工程学报,2015,12(1):171-176.(TIAN Z Q, SONG Q, PAN J S, et al. Optimization analysis of equipment dispatching under railway emergency event[J]. Journal of Railway Science and Engineering, 2015,12(1):171-176.) [16] 周明,孙树栋.遗传算法原理及应用[M].北京:国防工业出版社,1999:58-59.(ZHOU M, SUN S D. Genetic Algorithms:Theory and Applications[M]. Beijing:National Defense Industry Press, 1999:58-59.) |