[1] KIM S H,COHEN M A,NETESSINE S. Performance contracting in after-sales service supply chains[J]. Management Science, 2007,53(12):1843-1858. [2] KIM S H,COHEN M A,NETESSINE S,et al. Contracting for infrequent restoration and recovery of mission-critical systems[J]. Management Science,2010,56(9):1551-1567. [3] GUAJARDO J A,COHEN M A,KIM S H,et al. Impact of performance-based contracting on product reliability:an empirical analysis[J]. Management Science,2012,58(5):961-979. [4] PATRA P, KUMAR U D, NOWICKI D R, et al. Effective management of performance-based contracts for sustainment dominant systems[J]. International Journal of Production Economics,2019,208:369-382. [5] QIU Q, CUI L, SHEN J, et al. Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts[J]. Computers and Industrial Engineering,2017,112:147-155. [6] THOMAS L C. A survey of maintenance and replacement models for maintainability and reliability of multi-item system[J]. Reliability Engineering,1986,16(4):297-309. [7] 杨元, 黎放, 侯重远, 等. 基于相关性的多部件系统机会成组维修优化[J]. 计算机集成制造系统,2012,18(4):827-832. (YANG Y, LI F, HOU C Y, et al. Opportunistic group maintenance optimization of multi-unit system under dependence[J]. Computer Integrated Manufacturing Systems,2012,18(4):827-832.) [8] 徐波, 韩学山, 孙宏斌, 等. 一种适用于发电机组的机会维修模型[J]. 中国电机工程学报,2018,38(1):120-129.(XU B,HAN X S, SUN H B, et al. A new opportunistic maintenance optimization model for power generating unit[J]. Proceedings of the CSEE,2018,38(1):120-129.) [9] TIAN Z, JIN T, WU B, et al. Condition based maintenance optimization for wind power generation systems under continuous monitoring[J]. Renewable Energy,2011,36(5):1502-1509. [10] IUNG B,DO P,LEVRAT E,et al. Opportunistic maintenance based on multi-dependent components of manufacturing system[J]. CIRP Annals,2016,65(1):401-404. [11] 管业勤, 蒋祖华, 孙小明, 等. 非计划停机下考虑结构相关性的串并联系统机会维修维修决策研究[J/OL]. 工业工程与管理[2020-05-04]. http://kns.cnki.net/kcms/detail/31.1738.T.20200310.1016.004.html. (GUAN Y Q,JIANG Z H,SUN X M, et al. Research on opportunistic maintenance decision method of series-parallel system at unscheduled shutdown considering structural dependency[J]. Industrial Engineering and Management[2020-05-04]. http://kns.cnki.net/kcms/detail/31.1738.T.20200310.1016.004.html.) [12] 葛小凯, 胡剑波, 张博锋. 考虑依赖性的多部件系统状态维修优化仿真建模[J]. 航空学报,2013,34(8):1854-1863.(GE X K,HU J B,ZHANG B F. Simulation modeling for condition based maintenance optimism of multi-component systems with dependencies[J]. Acta Aeronautica et Astronautica Sinica,2013, 34(8):1854-1863.) [13] VU H C, DO P, BARROS A, et al. Dynamic grouping maintenance for complex structure systems with non-negligible replacement time[J]. IFAC Proceedings Volumes,2012,45(31):79-84. [14] 苏春, 胡照勇, 刘洋. 考虑季节因素的风力机多部件机会维修优化[J]. 中南大学学报,2020,27(2):490-499.(SU C,HU Z Y, LIU Y. Multi-component opportunistic maintenance optimization for wind turbines with consideration of seasonal factor[J]. Journal of Central South University, 2020, 27(2):490-499.) [15] 李志栋, 张涛. 非完美特性下的多状态系统检测与维修优化[J]. 北京航空航天大学学报,2017,43(5):951-960.(LI Z D, ZHANG T. Optimization of inspection and repair of multi-state system under imperfect characteristics[J]. Journal of Beijing University of Aeronautics and Astronautics, 2017, 43(5):951-960.) [16] 宋之杰, 常建美, 侯贵宾, 等. 多部件串联系统机会维修策略优化[J]. 机械设计与制造,2015(4):259-262.(SONG Z J, CHANG J M, HOU G B, et al. Optimized opportunistic maintenance strategy for multi-components series system[J]. Machinery Design and Manufacture,2015(4):259-262.) [17] GIBBONS R. Incentives between firms (and within)[J]. Management Science,2005,51(16):2-17. [18] NOWICKI D R,KUMAR U D,STEUDEL H J,et al. Spares provisioning under performance-based logistics contract:profitcentric approach[J]. Journal of Operational Research Society, 2008,59(3):342-352. [19] 李维刚, 李阳, 赵云涛, 等. 基于改进灰狼算法的粒子滤波算法研究[J]. 系仿真学报,2021,33(1):37-45.(LI W G,LI Y, ZHAO Y T,et al. Research on particle filter algorithm based on improved grey wolf algorithm[J]. Journal of System Simulation, 2021,33(1):37-45.) |