[1] LINN R, ZHANG W. Hybrid flow shop scheduling: a survey[J]. Computers & Industrial Engineering, 1999, 37(1/2): 57-61. [2] GUPTA J N D. Two-stage, hybrid flowshop scheduling problem[J]. Journal of the Operational Research Society, 1988, 39(4): 359-364. [3] LI J Q, PAN Q K, WANG F T. A hybrid variable neighborhood search for solving the hybrid flow shop scheduling problem[J]. Applied Soft Computing, 2014, 24(24): 63-77. [4] LI J Q, PAN Q K. Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm[J]. Information Sciences, 2015, 316 (C): 487-502. [5] NADERI B, ZANDIEH M, KHALEGHI G B A, et al. An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness[J]. Expert Systems with Applications, 2009, 36(6): 9625-9633. [6] LEE G C. Estimating order lead times in hybrid flowshops with different scheduling rules[J]. Computers & Industrial Engineering, 2009, 56(4): 1668-1674. [7] 李铁克, 肖拥军, 王柏琳. 基于局部性修复的HFS机器故障重调度[J]. 管理工程学报, 2010, 24(3): 45-49. (LI T K, XIAO Y J, WANG B L. HFS rescheduling under machine failures based on local repair [J]. Journal of Industrial Engineering and Engineering Management, 2010, 24(3): 45-49.) [8] KUNDAKCI N, KULAK O. Hybrid genetic algorithms for minimizing makespan in dynamic job shop scheduling problem [J]. Computers & Industrial Engineering, 2016, 96 (C): 31-51. [9] RAHMANI D, RAMEZANIAN R. A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: a case study[J]. Computers & Industrial Engineering, 2016, 98(10): 360-372. [10] KOUIDER A, BOUZOUIA B. Multi-Agent job shop scheduling system based on co-operative approach of idle time minimisation[J]. International Journal of Production Research, 2012, 50(2): 409-424. [11] MARTIN S, OUELHADJ D, BEULLENS P, et al. A multi-Agent based cooperative approach to scheduling and routing[J]. European Journal of Operational Research, 2016, 254(1): 169-178. [12] 李应, 杨善林, 郑家强. 敏捷制造系统的基于Agent的混合调度[J]. 系统仿真学报, 2009, 21(12): 3763-3767. (LI Y, YANG S L, ZHENG J Q. Multi-Agent based hybrid scheduling strategy agile manufacturing system[J]. Journal of System Simulation, 2009, 21(12): 3763-3767.) [13] ZHANG S, WONG T N. Flexible job-shop scheduling/rescheduling in dynamic environment: a hybrid MAS/ACO approach[J]. International Journal of Production Research, 2016, 55(11): 3173-3196. [14] 龙田, 石宇强, 王俊佳. 柔性作业车间在线调度问题的仿真建模与分析[J]. 机械设计与制造, 2015(12): 27-30. (LONG T, SHI Y Q, WANG J J. Simulation modeling and analysis for online flexible job-shop scheduling problem [J]. Machine Design & Manufacture, 2015(12): 27-30.) [15] BRAH S A, LUAN L L. Heuristics for scheduling in a flow shop with multiple processors[J]. European Journal of Operational Research, 1999, 113(1): 113-122. [16] GUINET A G P, SOLOMON M M. Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time[J]. International Journal of Production Research, 1996, 34(6): 1643-1654. |