[1] XIN J, NEGENBORN R R, LODEWIJLCS G. Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control [J]. Transportation Research Part C, 2014,44(6):214-231. [2] VIS I F A, CARLO H J. Sequencing two cooperating automated stacking cranes in a container terminal [J]. Transportation Science, 2010,44(2):169-181. [3] PARK T, CHOE R, OK S M. Real-time scheduling for twin RMGs in an automated container yard [J]. OR Spectrum, 2010,32(4):593-615. [4] DORNDORF U, SCHNEIDER F. Scheduling automated triple cross-over stacking cranes in a container yard [J]. OR Spectrum, 2010,32(6):617-633. [5] KEMME N. Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals [J]. OR Spectrum, 2012,34(2):563-591. [6] ZHANG C, WAN Y, LIU J, et al. Dynamic crane deployment in container storage yards [J]. Transportation Research Part B, 2002,36(5):537-555. [7] HE J, CHANG D, MI W, et al. A hybrid parallel genetic algorithm for yard crane scheduling [J]. Transportation Research Part E, 2010,46(8):136-155. [8] NG W C. Crane scheduling in container yards with inter-crane interference [J]. European Journal of Operational Research, 2005,164(3):64-78. [9] BIAN Z, JIN Z-H. Optimization on retrieving containers based on multi-phase hybrid dynamic programming [J]. Procedia-Social and Behavioral Sciences, 2013,96(3):844-855. [10] PETERING M E H, MURTY K G. Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal [J]. Computers and Operations Research, 2009,36(1):1711-1725. [11] LEE B K, KIM K H. Comparison and evaluation of various cycle-time models for yard cranes in container terminals [J]. International Journal of Production Economics, 2010,126(2):350-360. [12] ANGELOUDIS P, BELL M G H. An uncertainty-aware AGV assignment algorithm for automated container terminals [J]. Transportation Research Part E, 2010,46(5):354-366. [13] RASHIDI H, TSANG E P K. A complete and an incomplete algorithm for automated guided vehicle scheduling in container terminals [J]. Computers and Mathematics with Applications, 2011,61(12):630-641. [14] SKINNER B, YUAN S, HUANG S, et al. Optimisation for job scheduling at automated container terminals using genetic algorithm [J]. Computers and Industrial Engineering, 2013,64(1):511-523. [15] VIS I F A, CARLO H J. Sequencing two cooperating automated stacking cranes in a container terminal [J]. Transportation Science, 2010,44(2):169-183. |