1 |
杨业建,姜泽毅,张欣欣.板坯热轧批量计划数学模型及求解算法[J].北京科技大学学报, 2012, 34(4): 457-463.
|
|
YANG Y J, JIANG Z Y, ZHANG X X. Mathematical model and solving algorithm for the lot planning of slab hot rolling[J]. Journal of University of Science and Technology Beijing, 2012, 34(4): 457-463.
|
2 |
李铁克,郭冬芬.基于约束满足的热轧批量计划模型与算法[J].控制与决策, 2007, 22(4): 389-393, 398. 10.3321/j.issn:1001-0920.2007.04.006
|
|
LI T K, GUO D F. Model and algorithm for hot-rolling batch plan based on constraint satisfaction[J]. Control and Decision, 2007, 22(4): 389-393, 398. 10.3321/j.issn:1001-0920.2007.04.006
|
3 |
PAN Q K, CHEN Q D, MENG T, et al. A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production[J]. Applied Mathematical Modelling, 2017, 48: 516-533. 10.1016/j.apm.2017.03.067
|
4 |
CHEN Q D, PAN Q K, ZHANG B, et al. Effective hot rolling batch scheduling algorithms in compact strip production[J]. IEEE Transactions on Automation Science and Engineering, 2019, 16(4): 1933-1951. 10.1109/tase.2019.2914925
|
5 |
刘健,王彬,王柏琳,等.板坯热轧计划编制的优化模型与算法[J].计算机集成制造系统, 2015, 21(12): 3263-3270. JournalArticle/5b3b4a39c095d70f0069c4d9
|
|
LIU J, WANG B, WANG B L, et al. Optimization model and algorithm for slab hot rolling planning problem[J]. Computer Integrated Manufacturing Systems, 2015, 21(12): 3263-3270. JournalArticle/5b3b4a39c095d70f0069c4d9
|
6 |
张涛,王梦光,杨建夏.不确定计划数的轧制批量计划的模型和算法[J].系统工程学报, 2000, 15(1): 54-60. 10.3969/j.issn.1000-5781.2000.01.009
|
|
ZHANG T, WANG M G, YANG J X. The model and algorithm for the hot-milling batch planning with uncertain number[J]. Journal of Systems Engineering, 2000, 15(1): 54-60. 10.3969/j.issn.1000-5781.2000.01.009
|
7 |
TANG L X, HUANG L. Optimal and near-optimal algorithms to rolling batch scheduling for seamless steel tube production[J]. International Journal of Production Economics, 2007, 105(2): 357-371. 10.1016/j.ijpe.2004.04.011
|
8 |
吴子轩,李铁克,张文新,等.考虑交货因素的热轧无缝钢管订单排程模型与算法[J].中国管理科学, 2018, 26(5): 129-137.
|
|
WU Z X, LI T K, ZHANG W X, et al. Order scheduling model and algorithm for hot-rolled seamless steel tube with delivery requirements[J]. Chinese Journal of Management Science, 2018, 26(5): 129-137.
|
9 |
柏亮,李铁克,王柏琳,等.基于变邻域搜索的热轧圆钢批量调度多目标优化方法[J].工程科学学报, 2015, 37(1): 111-117. 10.13374/j.issn2095-9389.2015.01.017
|
|
BAI L, LI T K, WANG B L, et al. Variable neighborhood search based multi-objective optimization method for batch scheduling of hot-rolled bars[J]. Chinese Journal of Engineering, 2015, 37(1): 111-117. 10.13374/j.issn2095-9389.2015.01.017
|
10 |
SUH M S, LEE A, LEE Y J, et al. Evaluation of ordering strategies for constraint satisfaction reactive scheduling[J]. Decision Support Systems, 1998, 22(2): 187-197. 10.1016/s0167-9236(97)00052-3
|
11 |
潘瑞林,胡邦国,曹建华,等.基于仿真优化的加热炉—热轧区间重调度[J].计算机集成制造系统, 2014, 20(6): 1405-1415.
|
|
PAN R L, HU B G, CAO J H, et al. Heating furnace and hot rolling interval rescheduling based on simulation optimization[J]. Computer Integrated Manufacturing Systems, 2014, 20(6): 1405-1415.
|
12 |
郭延欣,李铁克,张文学.基于人机交互的热轧动态调度[J].计算机工程与设计, 2012, 33(1): 367-371. 10.3969/j.issn.1000-7024.2012.01.072
|
|
GUO Y X, LI T K, ZHANG W X. Dynamic scheduling of hot rolling based on human-computer interaction[J]. Computer Engineering and Design, 2012, 33(1): 367-371. 10.3969/j.issn.1000-7024.2012.01.072
|
13 |
刘乐.单机最大延迟重调度的和声变邻域搜索算法[J].计算机集成制造系统, 2016, 22(8): 1977-1991. 10.13196/j.cims.2016.08.016
|
|
LIU L. Harmony variable neighborhood search algorithm for single-machine maximum lateness rescheduling[J]. Computer Integrated Manufacturing Systems, 2016, 22(8): 1977-1991. 10.13196/j.cims.2016.08.016
|
14 |
TIGHAZOUI A, SAUVEY C, SAUER N. Predictive-reactive strategy for flowshop rescheduling problem: minimizing the total weighted waiting times and instability[J]. Journal of Systems Science and Systems Engineering, 2021, 30(3): 253-275. 10.1007/s11518-021-5490-8
|
15 |
PENG K K, DENG X D, ZHANG C J, et al. An improved imperialist competitive algorithm for hybrid flowshop rescheduling in steelmaking-refining-continuous casting process[J]. Measurement and Control, 2020, 53(9/10): 1920-1928. 10.1177/0020294020960187
|
16 |
GUO Y D, HUANG M, WANG Q, et al. Single-machine rework rescheduling to minimize maximum waiting-times with fixed sequence of jobs and ready times[J]. Computers and Industrial Engineering, 2016, 91: 262-273. 10.1016/j.cie.2015.11.021
|
17 |
CALDEIRA R H, GNANAVELBABU A, VAIDYANATHAN T. An effective backtracking search algorithm for multi-objective flexible job shop scheduling considering new job arrivals and energy consumption[J]. Computers and Industrial Engineering, 2020, 149: No.106863. 10.1016/j.cie.2020.106863
|
18 |
王圣尧,王凌,方晨,等.分布估计算法研究进展[J].控制与决策, 2012, 27(7): 961-966, 974.
|
|
WANG S Y, WANG L, FANG C, et al. Advances in estimation of distribution algorithms[J]. Control and Decision, 2012, 27(7): 961-966, 974.
|
19 |
KOSIBA E D, WRIGHT J R, COBBS A E. Discrete event sequencing as a traveling problem[J]. Computers in Industry, 1992, 19(3): 317-327. 10.1016/0166-3615(92)90069-y
|