计算机应用 ›› 2005, Vol. 25 ›› Issue (01): 56-57.DOI: 10.3724/SP.J.1087.2005.00056

• 软件技术 • 上一篇    下一篇

基于关键链的软件项目进度风险管理

蒋国萍,陈英武   

  1. 国防科技大学信息系统与管理学院
  • 发布日期:2005-01-01 出版日期:2005-01-01
  • 基金资助:

    国家自然科学基金资助项目(70272002)

Schedule risk management method of software project based on critical chain

JIANG Guo-ping, CHEN Ying-wu   

  1. School of Information System and Management, National University of Defense Technology
  • Online:2005-01-01 Published:2005-01-01

摘要: 文中讨论基于关键链技术的软件项目进度风险管理方法。基于软件过程工作分解结构,预测各项工作在理想工作条件下的工期,考虑人力资源的约束与冲突,建立项目的关键链。通过对各项工作的风险分析,为关键链、非关键链分别设置项目缓冲、输入缓冲,通过对缓冲区的监控来进行风险的控制和管理。

关键词: 软件项目, 进度风险管理, 关键链

Abstract: Scheduling risk is one of the most critical risks of software project. The scheduling risk management based on task critical chain was discussed in this paper. Each task’s duration in ideal working environment was estimated, personnel resource constraints were taken into account, and the project’s critical chain was built. After the risk analysis for each task, the project buffer was established for the critical chain and feeding buffer was established for non-critical chain. The buffer area was treated as resort of risk control and management.

Key words: software project, scheduling risk management, critical chain

中图分类号: