[1] 史峰,周文梁,陈彦,等.基于弹性需求的旅客列车开行方案优化研究[J].铁道学报,2008,30(3):1-6. (SHI F, ZHOU W L, CHEN Y, et al. Optimization study on passenger train plans with elastic demands[J]. Journal of the China Railway Society, 2008, 30(3):1-6.) [2] 杨宇正,周文梁.基于弹性需求的高速铁路列车开行方案优化[J].铁道科学与工程学报,2012,9(3):34-38. (YANG Y Z, ZHOU W L. Optimization of train plan on high-speed railway based on elastic demand[J]. Journal of Railway Science and Engineering, 2012, 9(3):34-38.) [3] 苏焕银,史峰,邓连波,等.面向时变需求的高速铁路列车开行方案优化方法[J].交通运输系统工程与信息,2016,16(5):110-116. (SU H Y, SHI F, DENG L B, et al. Time-dependent demand oriented line planning optimization for the high-speed railway[J]. Journal of Transportation Systems Engineering and Information Technology, 2016, 16(5):110-116.) [4] 彭宏勤,朱郁俊.基于客流动态分配的城际列车开行方案[J].交通运输系统工程与信息,2013,13(1):111-117. (PENG H Q, ZHU Y J. Intercity train operation schemes based on passenger flow dynamic assignment[J]. Journal of Transportation Systems Engineering and Information Technology, 2013, 13(1):111-117.) [5] 邓连波,王峰,周钊,等.城际直达列车开行方案优化研究[J].铁道科学与工程学报,2013,10(6):97-102. (DENG L B, WANG F, ZHOU Z, et al. Optimization method of intercity trains through train plan[J]. Journal of Railway Science and Engineering, 2013, 10(6):97-102.) [6] KASPI M, RAVIV T. Service-oriented line planning and timetable for passenger trains[J]. Transportation Science,2013,47(3):295-311. [7] 付慧伶,聂磊,杨浩,等.基于备选集的高速铁路列车开行方案优化方法研究[J].铁道学报,2010,32(6):1-8. (FU H L, NIE L, YANG H, et al. Research on the method for optimization of candiate-train-set based train operation plan for high-speed railway[J]. Journal of the China Railway Society, 2010, 32(6):1-8.) [8] BORNDORFER R, GRÖTSCHEL M, PFETSCH M E. A column-generation approach to line planning in public transport[J].Transportation Science, 2007, 41(1):123-132. [9] 汪波,杨浩,张志华.基于周期运行图的京津城际铁路列车开行方案研究[J].铁道学报,2007,29(2):8-13. (WANG B, YANG H, ZHANG Z H. The research on the train operation plan of the beijing-tianjin inter-city railway based on periodic train diagrams[J]. Journal of the China Railway Society, 2007, 29(2):8-13.) [10] HADAS Y, SHNAIDERMAN M. Public-transit frequency setting using minimum-cost approach with stochastic demand and travel time[J]. Transportation Research Part B:Methodological, 2012, 46(8):1068-1084. [11] 孟学雷,贾利民,卜萌,等.基于决策偏好可控的地铁列车开行方案设计研究[J].铁道科学与工程学报,2012,9(1):46-50. (MENG X L, JIA L M, BU M, et al.Train operation design based on decision preference controllable[J]. Journal of Railway Science and Engineering, 2012, 9(1):46-50.) [12] 蒲松,陈钉均,王文宪.基于改进退火算法的高速列车开行方案研究[J].计算机仿真,2015,32(7):150-153. (PU S, CHEN D J, WANG W X. High-speed passenger train operation plan based on modified simulated annealing[J].Computer Simulation, 2015, 32(7):150-153.) [13] 徐鹏.城际客运专线列车开行方案研究[D].成都:西南交通大学,2010:28-51. (XU P. Research on the train operation scheme of the intercity dedicated passenger railway[D].Chengdu:Southwest Jiaotong University, 2010:28-51.) [14] 李得伟,韩宝明,李晓娟,等.基于节点服务的高速铁路列车停站方案优化模型[J].铁道学报,2013,35(6):1-5. (LI D W, HAN B M, LI X J, et al. High-speed railway stopping schedule optimization model based on node service[J]. Journal of the China Railway Society, 2013, 35(6):1-5.) [15] 陈鹏.城际轨道交通与城市交通换乘衔接研究[D].西安:长安大学,2015:20-53. (CHEN P. Research on transfer convergence between inter-city rail transit and urban transport[D].Xi'an:Chang'an University, 2015:20-53.) |