| [1]FISHER W W. Markov process modeling of a maintenance system spare, cannibalization, and manpower constraints[J]. Mathematical and Computer Modelling, 1990, 13(7): 119-125.
[2]HOCHBERG M. Generalized multicomponent systems under cannibalization[J]. Naval Research Logistics Quarterly, 1973, 20(4): 585-605.
[3]SHERBROOKE C C. METRIC: a multi-echelon technique for recoverable item control[J]. Operations Research, 1968, 16(2): 122-141.
[4]MUCKSTADT J A. A model for a multi-item, multi-echelon, multi-indenture inventory system[J]. Management Science, 1973, 20(4): 472-481.
[5]FISHER W W. An improved simulation model for cannibalization policy performance comparison in a complex maintenance system[J]. Simulation, 1989, 52(4): 154-164.
[6]FISHER W W. Analytical performance estimation for complex maintenance systems[J]. Simulation, 1988, 51(6): 222-226.
[7]LI L, ZHANG J, ZHANG T, et al.Mission oriented cannibalization policy problem and its solving algorithm[J]. Systems Engineering-Theory ﹠ Practice, 2009, 29(7): 97-104.(李羚伟, 张建军, 张涛, 等. 面向任务的拼修策略问题及求解算法[J]. 系统工程理论与实践, 2009, 29(7): 97-104.)
[8]ZHOU W, JIANG P, LIU Y, et al.A spare sallocation model for repairable systems considering correlated spare demands[J]. Journal of National University of Defense Technology, 2012, 34(3): 68-73.(周伟,蒋平,刘亚杰,等.考虑需求相关的可修复系统备件配置模型[J].国防科技大学学报,2012,34(3):68-73.)
[9]LYU X, YU Y, ZHANG L, et al.Selective maintenance model considering cannibalization and multiple maintenance actions[J]. Acta Armamentarii, 2012, 33(3): 360-366. (吕学志, 于永利, 张柳, 等. 考虑拼修与多种维修活动的维修任务选择模型[J]. 兵工学报, 2012, 33(3): 360-366.)
[10]RUAN M, LI Q, PENG Y, et al.Evaluation of equipment system availability for multi-echelon maintenance supply with cannibalization[J]. Acta Aeronautica et Astronsutica Sinica, 2012, 33(4): 658-665. (阮旻智, 李庆民, 彭英武, 等. 串件拼修对策下多级维修供应的装备系统可用度评估[J]. 航空学报, 2012, 33(4): 658-665.)
[11]LUO Y, RUAN M, LI Q. Evaluation of availability for incomplete cannibalization systems under multi-echelon maintenance supply[J]. Systems Engineering and Electronics, 2012, 34(6): 1182-1186. (罗祎, 阮旻智, 李庆民. 多级维修供应下不完全串件系统可用度评估[J]. 系统工程与电子技术, 2012, 34(6): 1182-1186.)
[12]SHERBROOKE C C. Optimal inventory modeling of system: multi-echelon techniques[M]. 2nd ed. Boston: Artech House, 2004.
[13]WANG N, KANG R, CHENG H. Study on the dynamic characteristics of spare inventory based on Markov process[J]. Acta Armamentarii, 2009, 30(7): 984-988. (王乃超, 康锐, 程海龙. 基于马尔科夫过程的备件库存动态特性分析[J]. 兵工学报, 2009, 30(7): 984-988.) |