[1] BAGHERI M, GHOLINEJAD DEVIN A, IZANLOO A. An application of stochastic programming method for nurse scheduling problem in real word hospital[J]. Computers and Industrial Engineering,2016,96:192-200. [2] LEGRAIN A,OMER J,ROSAT S. A rotation-based branch-andprice approach for the nurse scheduling problem[J]. Mathematical Programming Computation,2020,12(3):417-450. [3] IKEDA K, NAKAMURA Y, HUMBLE T S. Application of quantum annealing to nurse scheduling problem[J]. Scientific Reports,2019,9:No. 12837. [4] CACCHIANI V,SALAZAR-GONZÁLEZ J J. Optimal solutions to a real-world integrated airline scheduling problem[J]. Transportation Science,2017,51(1):250-268. [5] SHAO S, SHERALI H, HAOUARI M. A novel model and decomposition approach for the integrated airline fleet assignment, aircraft routing, and crew pairing problem[J]. Transportation Science,2017,51(1):233-249. [6] ALKHATIB S F S,MIGDADI Y K A A. Taxonomies of airline scheduling strategies:cross-regional worldwide analysis[J]. International Journal of Services and Operations Management, 2019,33(1):26-48. [7] 于焯, 樊玮. 基于均衡条件的成本最小化航线调配问题研究[J]. 计算机技术与发展,2017,27(8):145-148.(YU Z,FAN W. Research on aircraft routing problem for airlines cost minimization with fleet balance application[J]. Computer Technology and Development,2017,27(8):145-148.) [8] 钟异莹, 陈坚, 邵毅明, 等. 基于DEA的轨道交通与常规公交换乘效率测评模型[J]. 计算机应用研究,2018,35(5):1446-1449.(ZHONG Y Y,CHEN J,SHAO Y M,et al. Evaluation model of transfer efficiency between urban rail transit and bus transit based on DEA[J]. Application Research of Computers, 2018,35(5):1446-1449.) [9] CANCA D,DE-LOS-SANTOS A,LAPORTE G,et al. The railway rapid transit network construction scheduling problem[J]. Computers and Industrial Engineering,2019,138:No. 106075. [10] POUR S M,MARJANI RASMUSSEN K,DRAKE J H,et al. A constructive framework for the preventive signalling maintenance crew scheduling problem in the Danish railway system[J]. Journal of the Operational Research Society,2019,70(11):1965-1982. [11] 王念娇, 姚四改,基于改进粒子群优化算法的排课问题[J]. 计算机应用,2013,33(1):207-210.(WANG N J,YAO S G. Curriculum scheduling based on improved particle swarm optimization algorithm[J]. Journal of Computer Applications, 2013,33(1):207-210.) [12] JHA S,SHAHABADKAR P. Solving a class scheduling problem using genetic algorithm[J]. International Journal of Advances in Engineering and Technology,2016,9(5):551-562. [13] AGUSTIN L, LOSITO J, MENDOZA A, et al. Predictive analytics implementing genetic algorithm on class scheduling system[J]. International Journal of Advanced Research in Computer Science,2018,10(6):18-22. [14] 李洋州, 顾磊. 基于曲线自适应和模拟退火的蝗虫优化算法[J]. 计算机应用研究,2019,36(12):3635-3643.(LI Y Z,GU L. Grasshopper optimization algorithm based on curve adaptive and simulated annealing[J]. Application Research of Computers, 2019,36(12):3635-3643.) [15] 马良, 朱刚, 宁爱兵. 蚁群优化算法[M]. 北京:科学出版社, 2008. (MA L,ZHU G,NING A B. Ant Colony Optimization Algorithm[M]. Beijing:Science Press,2008.) [16] 樊小毛, 马良. 0-1背包问题的蜂群优化算法[J]. 数学的实践与认识,2010,40(6):155-160.(FAN X M,MA L. Artificial bee colony algorithm for 0-1 knapsack problem[J]. Mathematics in Practice and Theory,2010,40(6):155-160.) [17] SEELEY T D. The Wisdom of the Hive:The Social Physiology of Honey Bee Colonies[M]. Cambridge:Harvard University Press, 1996. [18] PHAM D T,GHANBARZADEH A. The bees algorithm-a novel tool for complex optimization problems[R]. Manufacturing Engineering Center,Cardiff University,UK,2005. [19] DORIGO M, GAMBARDELLA L. Ant colony system:a cooperative learning approach to the traveling salesman problem[J]. IEEE Transactions on Evolutionary Computation,1997,1(1):53-66. [20] 张万绪, 张向兰, 李莹. 基于改进粒子群算法的智能机器人路径规划[J]. 计算机应用,2014,34(2):510-513.(ZHANG W X,ZHANG X L,LI Y. Path planning for intelligent robots based on improved particle swarm optimization algorithm[J]. Journal of Computer Applications,2014,34(2):510-513.) [21] 樊小毛, 马良. 多目标0-1规划问题的蜂群算法[J]. 微计算机信息,2010,26(10):207-208,107.(FAN X M,MA L. Bee colony algorithm for multi-objective 0-1 programming problem[J]. Microcomputer Information,2010,26(10):207-208,107.) |