[1] NELSON R T,HOLLOWAY C A,WONG R M L. Centralized scheduling and priority implementation heuristics for a dynamic job shop model with due dates and variable processing time[J]. AⅡE Transactions,1977,9(1):95-102. [2] 柴永生, 孙树栋, 余建军, 等. 基于免疫遗传算法的车间动态调度[J]. 机械工程学报,2005,41(10):23-27.(CHAI Y S,SUN S D,YU J J,et al. Dynamic shop scheduling based on immune genetic algorithm[J]. Journal of Mechanical Engineering,2005,41(10):23-27.) [3] 孟冠军, 杨大春, 陶细佩. 基于混合人工蜂群算法的多目标柔性作业车间调度问题研究[J]. 计算机应用研究,2019,36(4):972-974,979.(MENG G J,YANG D C,TAO X P. Study on multiobjective flexible job-shop scheduling problem based on hybrid artificial bee colony algorithm[J]. Application Research of Computers,2019,36(4):972-974,979.) [4] SHAHRABI J,ADIBI M A,MAHOOTCHI M. A reinforcement learning approach to parameter estimation in dynamic job shop scheduling[J]. Computers and Industrial Engineering,2017,110:75-82. [5] HE W,SUN D H. Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies[J]. The International Journal of Advanced Manufacturing Technology,2013,66(1/2/3/4):501-514. [6] 邹攀, 李蓓智, 杨建国, 等. 基于分层蚁群遗传算法的多目标柔性作业车间调度方法[J]. 中国机械工程,2015,26(21):2873-2879,2884.(ZOU P,LI B Z,YANG J G,et al. Hierarchical antgenetic algorithm-based multi-objective intelligent approach for flexible job shop scheduling[J]. China Mechanical Engineering, 2015,26(21):2873-2879,2884.) [7] 吴正佳, 何海洋, 黄灿超, 等. 带机器故障的柔性作业车间动态调度[J]. 机械设计与研究,2015,31(3):94-98.(WU Z J,HE H Y,HUANG C C,et al. Flexible job shop dynamic scheduling problem research with machine fault[J]. Machine Design and Research,2015,31(3):94-98.) [8] 孙丽珍, 毕利. 多约束条件下的动态柔性作业车间调度研究[J]. 控制工程,2020,27(11):1921-1929.(SUN L Z,BI L. Dynamic flexible job shop scheduling problem under multiple constraints[J]. Control Engineering of China,2020,27(11):1921-1929.) [9] NOUIRI M,BEKRAR A,JEMAI A,et al. Two stage particle swarm optimization to solve the flexible job shop predictive scheduling problem considering possible machine breakdowns[J]. Computers and Industrial Engineering,2017,112:595-606. [10] Al-HINAI N,ElMEKKAWY T Y. Robust and stable flexible job shop scheduling with random machine breakdowns using a hybrid genetic algorithm[J]. International Journal of Production Economics,2011,132(2):279-291. [11] NOUIRI M,BEKRAR A,TRENTESAUX D. Towards energy efficient scheduling and rescheduling for dynamic flexible job shop problem[J]. IFAC-PapersOnLine,2018,51(11):1275-1280. [12] 包哲人, 徐华. 面向能耗机制的多目标柔性作业车间调度[J]. 计算机应用研究,2017,34(12):3617-3622.(BAO Z R,XU H. Multi-objective flexible Job-Shop scheduling based on energyconsumption mechanism[J]. Application Research of Computers, 2017,34(12):3617-3622.) [13] 陈超, 王艳, 严大虎, 等. 面向能耗的柔性作业车间动态调度研究[J]. 系统仿真学报,2017,29(9):2168-2174,2181. (CHEN C,WANG Y,YAN D H,et al. Research on dynamic flexible job shop scheduling problem for energy consumption[J]. Journal of System Simulation,2017,29(9):2168-2174,2181.) [14] 曹庆奎, 张晓丽, 任向阳. 基于GASA的柔性作业车间动态调度研究[J]. 河北工程大学学报(自然科学版),2019,36(2):91-96.(CAO Q K,ZHANG X L,REN X Y. Research on dynamic scheduling of flexible job shop based on GASA[J]. Journal of Hebei University of Engineering(Natural Science Edition),2019, 36(2):91-96.) [15] 李明, 雷德明. 考虑准备时间和关键目标的柔性作业车间低碳调度研究[J]. 机械工程学报,2019,55(21):139-149.(LI M, LEI D M. Research on flexible job shop low carbon scheduling with setup times and key objectives[J]. Journal of Mechanical Engineering,2019,55(21):139-149.) [16] 吕聪, 魏康林. 柔性车间调度问题的协作混合帝国算法[J]. 计算机应用,2018,38(7):1882-1887.(LYU C,WEI K L. Cooperative hybrid imperialist competitive algorithm for flexible job-shop scheduling problem[J]. Journal of Computer Applications,2018,38(7):1882-1887.) |