Journal of Computer Applications ›› 2023, Vol. 43 ›› Issue (7): 2261-2270.DOI: 10.11772/j.issn.1001-9081.2022060824
• Computer software technology • Previous Articles Next Articles
Lei LI1, Guofu ZHANG1,2,3,4(), Zhaopin SU1,2,3,4, Feng YUE1,4
Received:
2022-06-08
Revised:
2022-09-26
Accepted:
2022-09-28
Online:
2022-10-25
Published:
2023-07-10
Contact:
Guofu ZHANG
About author:
LI Lei, born in 1998, M. S. candidate. His research interests include search based software engineering.Supported by:
李磊1, 张国富1,2,3,4(), 苏兆品1,2,3,4, 岳峰1,4
通讯作者:
张国富
作者简介:
李磊(1998—),男,安徽安庆人,硕士研究生,主要研究方向:基于搜索的软件工程;基金资助:
CLC Number:
Lei LI, Guofu ZHANG, Zhaopin SU, Feng YUE. Software testing resource allocation algorithm for dynamic changes in architecture[J]. Journal of Computer Applications, 2023, 43(7): 2261-2270.
李磊, 张国富, 苏兆品, 岳峰. 体系结构动态变化的软件测试资源分配算法[J]. 《计算机应用》唯一官方网站, 2023, 43(7): 2261-2270.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.joca.cn/EN/10.11772/j.issn.1001-9081.2022060824
参数 | 含义 |
---|---|
组件 | |
组件 | |
在测试阶段从组件 | |
在运行阶段从组件 | |
组件 | |
组件 | |
软件系统的预期寿命 |
Tab. 1 Related parameters of multi-objective optimization model
参数 | 含义 |
---|---|
组件 | |
组件 | |
在测试阶段从组件 | |
在运行阶段从组件 | |
组件 | |
组件 | |
软件系统的预期寿命 |
系统规模 | ||||
---|---|---|---|---|
简单系统 | 100 | {10,12,15} | {4E+3,1E+5,5E+5} | {0.8,0.9,0.95} |
复杂系统 | 150 | {20,24,30} | {8E+3,1.2E+5,1E+6} | {0.75,0.85,0.95} |
大型系统 | 200 | {50,60,75} | {2E+4,1.5E+5,1.2E+6} | {0.7,0.85,0.95} |
Tab. 2 Parameters of system
系统规模 | ||||
---|---|---|---|---|
简单系统 | 100 | {10,12,15} | {4E+3,1E+5,5E+5} | {0.8,0.9,0.95} |
复杂系统 | 150 | {20,24,30} | {8E+3,1.2E+5,1E+6} | {0.75,0.85,0.95} |
大型系统 | 200 | {50,60,75} | {2E+4,1.5E+5,1.2E+6} | {0.7,0.85,0.95} |
参数 | 取值 | 参数 | 取值 |
---|---|---|---|
[400,1 000] | [5.0,15.0] | ||
[0.01,0.1] | [0.25,0.75] | ||
[1.0,3.0] | [0,1.0] |
Tab. 3 Parameter ranges of components
参数 | 取值 | 参数 | 取值 |
---|---|---|---|
[400,1 000] | [5.0,15.0] | ||
[0.01,0.1] | [0.25,0.75] | ||
[1.0,3.0] | [0,1.0] |
系统规模 | 实例 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||
---|---|---|---|---|---|---|---|---|---|---|
|A| | |B| | |C| | |A| | |B| | |C| | |A| | |B| | |C| | ||
复杂软件系统 | 1 | 7 499 | 7500 | 1 896 | 7500 | 3 749 | 459 | 7495 | 3 495 | 10 |
2 | 7500 | 7500 | 685 | 7499 | 5 495 | 478 | 7495 | 3 497 | 46 | |
3 | 7 499 | 7500 | 1 728 | 7499 | 4 499 | 414 | 7471 | 1 497 | 1 | |
4 | 7500 | 7 499 | 1 400 | 7497 | 4 496 | 433 | 7494 | 2 496 | 39 | |
5 | 7 499 | 7500 | 1 029 | 7500 | 4 497 | 401 | 7496 | 3 495 | 55 | |
6 | 7 498 | 7499 | 1 412 | 7497 | 4 999 | 452 | 7497 | 3 747 | 67 | |
7 | 7500 | 7500 | 714 | 7497 | 5 747 | 463 | 7495 | 3 745 | 164 | |
8 | 7500 | 7500 | 1 524 | 7497 | 4 996 | 463 | 7492 | 3 246 | 214 | |
9 | 7499 | 7499 | 982 | 7498 | 6 247 | 447 | 7494 | 1 747 | 127 | |
10 | 7500 | 7500 | 869 | 7499 | 6 499 | 499 | 7497 | 2 498 | 65 | |
平均值 | 7500 | 7500 | 1 224 | 7488 | 5 112 | 451 | 7493 | 2 946 | 79 | |
大型软件系统 | 1 | 7499 | 250 | 0 | 7500 | 0 | 0 | 7491 | 0 | 0 |
2 | 7500 | 0 | 0 | 7500 | 0 | 0 | 7496 | 0 | 0 | |
3 | 7 499 | 0 | 0 | 7499 | 0 | 0 | 7496 | 0 | 0 | |
4 | 7500 | 250 | 0 | 7498 | 0 | 0 | 1996 | 0 | 0 | |
5 | 7499 | 250 | 0 | 7500 | 0 | 0 | 1000 | 0 | 0 | |
6 | 7498 | 500 | 0 | 7500 | 0 | 0 | 7497 | 0 | 0 | |
7 | 7500 | 0 | 0 | 7500 | 0 | 0 | 7495 | 0 | 0 | |
8 | 7500 | 0 | 0 | 7500 | 0 | 0 | 2000 | 0 | 0 | |
9 | 7499 | 250 | 0 | 7499 | 0 | 0 | 7490 | 0 | 0 | |
10 | 7 500 | 250 | 0 | 7499 | 0 | 0 | 7492 | 0 | 0 | |
平均值 | 7499 | 250 | 0 | 7500 | 0 | 0 | 7491 | 0 | 0 |
Tab. 4 Capacity value results of three algorithms
系统规模 | 实例 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||
---|---|---|---|---|---|---|---|---|---|---|
|A| | |B| | |C| | |A| | |B| | |C| | |A| | |B| | |C| | ||
复杂软件系统 | 1 | 7 499 | 7500 | 1 896 | 7500 | 3 749 | 459 | 7495 | 3 495 | 10 |
2 | 7500 | 7500 | 685 | 7499 | 5 495 | 478 | 7495 | 3 497 | 46 | |
3 | 7 499 | 7500 | 1 728 | 7499 | 4 499 | 414 | 7471 | 1 497 | 1 | |
4 | 7500 | 7 499 | 1 400 | 7497 | 4 496 | 433 | 7494 | 2 496 | 39 | |
5 | 7 499 | 7500 | 1 029 | 7500 | 4 497 | 401 | 7496 | 3 495 | 55 | |
6 | 7 498 | 7499 | 1 412 | 7497 | 4 999 | 452 | 7497 | 3 747 | 67 | |
7 | 7500 | 7500 | 714 | 7497 | 5 747 | 463 | 7495 | 3 745 | 164 | |
8 | 7500 | 7500 | 1 524 | 7497 | 4 996 | 463 | 7492 | 3 246 | 214 | |
9 | 7499 | 7499 | 982 | 7498 | 6 247 | 447 | 7494 | 1 747 | 127 | |
10 | 7500 | 7500 | 869 | 7499 | 6 499 | 499 | 7497 | 2 498 | 65 | |
平均值 | 7500 | 7500 | 1 224 | 7488 | 5 112 | 451 | 7493 | 2 946 | 79 | |
大型软件系统 | 1 | 7499 | 250 | 0 | 7500 | 0 | 0 | 7491 | 0 | 0 |
2 | 7500 | 0 | 0 | 7500 | 0 | 0 | 7496 | 0 | 0 | |
3 | 7 499 | 0 | 0 | 7499 | 0 | 0 | 7496 | 0 | 0 | |
4 | 7500 | 250 | 0 | 7498 | 0 | 0 | 1996 | 0 | 0 | |
5 | 7499 | 250 | 0 | 7500 | 0 | 0 | 1000 | 0 | 0 | |
6 | 7498 | 500 | 0 | 7500 | 0 | 0 | 7497 | 0 | 0 | |
7 | 7500 | 0 | 0 | 7500 | 0 | 0 | 7495 | 0 | 0 | |
8 | 7500 | 0 | 0 | 7500 | 0 | 0 | 2000 | 0 | 0 | |
9 | 7499 | 250 | 0 | 7499 | 0 | 0 | 7490 | 0 | 0 | |
10 | 7 500 | 250 | 0 | 7499 | 0 | 0 | 7492 | 0 | 0 | |
平均值 | 7499 | 250 | 0 | 7500 | 0 | 0 | 7491 | 0 | 0 |
系统规模 | 实例 | 覆盖值/% | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第1阶段 | 第2阶段 | 第3阶段 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||||
Cv(A,B) | Cv(B,A) | Cv(A,B) | Cv(B,A) | Cv(A,B) | Cv(B,A) | Cv(A,C) | Cv(C,A) | Cv(A,C) | Cv(C,A) | Cv(A,C) | Cv(C,A) | ||
复杂软件系统 | 1 | 99.23 | 27.87 | 100.00 | 0.00 | 100.00 | 1.04 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 99.11 | 21.15 | 100.00 | 3.99 | 100.00 | 7.61 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
3 | 96.65 | 38.23 | 100.00 | 2.21 | 100.00 | 0.84 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
4 | 97.81 | 33.21 | 100.00 | 0.99 | 100.00 | 3.56 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
5 | 98.48 | 24.58 | 100.00 | 3.71 | 100.00 | 12.91 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
6 | 96.43 | 43.81 | 99.92 | 35.51 | 100.00 | 33.92 | 100.00 | 0.00 | 100.00 | 0.13 | 100.00 | 0.00 | |
7 | 98.19 | 29.75 | 100.00 | 1.93 | 100.00 | 1.52 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
8 | 99.09 | 17.61 | 100.00 | 30.83 | 100.00 | 28.91 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 1.19 | |
9 | 97.19 | 39.78 | 100.00 | 0.73 | 100.00 | 42.37 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.28 | |
10 | 98.08 | 26.12 | 99.60 | 35.71 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
平均值 | 98.03 | 30.21 | 99.95 | 11.45 | 100.00 | 12.27 | 100.00 | 0.00 | 100.00 | 0.01 | 100.00 | 0.15 | |
大型软件系统 | 1 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
3 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
4 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
5 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
6 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
7 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
8 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
9 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
10 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
平均值 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
Tab. 5 Coverage value results of three algorithms
系统规模 | 实例 | 覆盖值/% | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第1阶段 | 第2阶段 | 第3阶段 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||||
Cv(A,B) | Cv(B,A) | Cv(A,B) | Cv(B,A) | Cv(A,B) | Cv(B,A) | Cv(A,C) | Cv(C,A) | Cv(A,C) | Cv(C,A) | Cv(A,C) | Cv(C,A) | ||
复杂软件系统 | 1 | 99.23 | 27.87 | 100.00 | 0.00 | 100.00 | 1.04 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 99.11 | 21.15 | 100.00 | 3.99 | 100.00 | 7.61 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
3 | 96.65 | 38.23 | 100.00 | 2.21 | 100.00 | 0.84 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
4 | 97.81 | 33.21 | 100.00 | 0.99 | 100.00 | 3.56 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
5 | 98.48 | 24.58 | 100.00 | 3.71 | 100.00 | 12.91 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
6 | 96.43 | 43.81 | 99.92 | 35.51 | 100.00 | 33.92 | 100.00 | 0.00 | 100.00 | 0.13 | 100.00 | 0.00 | |
7 | 98.19 | 29.75 | 100.00 | 1.93 | 100.00 | 1.52 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
8 | 99.09 | 17.61 | 100.00 | 30.83 | 100.00 | 28.91 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 1.19 | |
9 | 97.19 | 39.78 | 100.00 | 0.73 | 100.00 | 42.37 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.28 | |
10 | 98.08 | 26.12 | 99.60 | 35.71 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
平均值 | 98.03 | 30.21 | 99.95 | 11.45 | 100.00 | 12.27 | 100.00 | 0.00 | 100.00 | 0.01 | 100.00 | 0.15 | |
大型软件系统 | 1 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
3 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
4 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
5 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
6 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
7 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
8 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
9 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
10 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | |
平均值 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
阶段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 1.33E+07 | 4.54E+06 | 1.13E+07 | 7.84E+06 | 7.60E+06 | 7.72E+06 | 6.71E+06 | 9.99E+06 | 5.04E+06 | 5.77E+06 | 7.98E+06 |
标准差 | 6.11E+04 | 3.25E+04 | 3.60E+04 | 4.11E+04 | 5.08E+04 | 6.67E+04 | 3.35E+04 | 4.28E+04 | 4.12E+04 | 2.74E+04 | 4.33E+04 | ||
B | 均值 | 9.28E+06 | 3.55E+06 | 8.78E+06 | 5.74E+06 | 5.64E+06 | 5.79E+06 | 4.81E+06 | 7.26E+06 | 3.55E+06 | 4.63E+06 | 5.90E+06 | |
标准差 | 2.82E+06 | 7.32E+05 | 2.40E+06 | 2.10E+06 | 1.47E+06 | 2.05E+06 | 1.51E+06 | 2.13E+06 | 1.40E+06 | 9.03E+05 | 1.75E+06 | ||
C | 均值 | 1.14E+07 | 2.00E+06 | 9.60E+06 | 6.23E+06 | 4.48E+06 | 6.25E+06 | 2.80E+06 | 7.75E+06 | 3.22E+06 | 3.04E+06 | 5.68E+06 | |
标准差 | 2.46E+05 | 1.67E+06 | 3.57E+05 | 1.20E+06 | 2.76E+06 | 2.20E+05 | 2.67E+06 | 2.13E+06 | 1.32E+06 | 2.10E+06 | 1.47E+06 | ||
第 2 阶 段 | A | 均值 | 2.74E+08 | 2.30E+08 | 2.00E+08 | 1.91E+08 | 1.96E+08 | 1.99E+08 | 2.36E+08 | 2.44E+08 | 2.25E+08 | 2.60E+08 | 2.26E+08 |
标准差 | 1.16E+07 | 7.32E+06 | 7.81E+06 | 6.64E+06 | 8.89E+06 | 1.20E+07 | 9.34E+06 | 9.06E+06 | 1.14E+07 | 1.16E+07 | 9.57E+06 | ||
B | 均值 | 5.90E+07 | 4.94E+07 | 1.84E+07 | 3.13E+07 | 3.33E+07 | 3.15E+07 | 6.52E+07 | 4.73E+07 | 4.88E+07 | 7.36E+07 | 4.58E+07 | |
标准差 | 7.19E+07 | 6.62E+07 | 4.22E+07 | 4.29E+07 | 5.25E+07 | 5.02E+07 | 7.08E+07 | 6.76E+07 | 6.00E+07 | 7.47E+07 | 5.99E+07 | ||
C | 均值 | 1.43E+08 | 1.26E+08 | 8.91E+07 | 9.37E+07 | 9.18E+07 | 9.48E+07 | 1.20E+08 | 1.27E+08 | 1.18E+08 | 1.41E+08 | 1.14E+08 | |
标准差 | 2.13E+07 | 1.81E+07 | 1.71E+07 | 1.15E+07 | 1.47E+07 | 1.33E+07 | 1.51E+07 | 2.08E+07 | 1.89E+07 | 2.19E+07 | 1.73E+07 | ||
第 3 阶 段 | A | 均值 | 8.93E+09 | 6.62E+09 | 1.04E+10 | 6.75E+09 | 6.81E+09 | 7.03E+09 | 5.84E+09 | 5.45E+09 | 5.17E+09 | 6.89E+09 | 6.99E+09 |
标准差 | 6.17E+08 | 7.98E+08 | 6.15E+08 | 5.83E+08 | 7.30E+08 | 6.93E+08 | 1.17E+09 | 1.13E+09 | 1.06E+09 | 7.16E+08 | 8.11E+08 | ||
B | 均值 | 1.92E+09 | 1.09E+09 | 1.03E+09 | 7.44E+08 | 1.17E+09 | 1.48E+09 | 6.92E+08 | 7.04E+08 | 5.14E+08 | 7.62E+08 | 1.01E+09 | |
标准差 | 2.39E+09 | 1.50E+09 | 2.22E+09 | 1.36E+09 | 1.89E+09 | 2.17E+09 | 1.25E+09 | 1.37E+09 | 1.24E+09 | 1.30E+09 | 1.67E+09 | ||
C | 均值 | 4.21E+08 | 4.17E+08 | 9.05E+07 | 4.29E+08 | 4.87E+08 | 7.27E+08 | 9.91E+08 | 1.34E+09 | 7.08E+08 | 5.54E+08 | 6.16E+08 | |
标准差 | 7.44E+08 | 6.45E+08 | 4.96E+08 | 6.80E+08 | 5.30E+08 | 7.60E+08 | 7.80E+08 | 6.36+8 | 6.04E+08 | 6.71E+08 | 6.57E+08 |
Tab. 6 Hypervolume (mean and standard deviation) results of three algorithms in complex systems
阶段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 1.33E+07 | 4.54E+06 | 1.13E+07 | 7.84E+06 | 7.60E+06 | 7.72E+06 | 6.71E+06 | 9.99E+06 | 5.04E+06 | 5.77E+06 | 7.98E+06 |
标准差 | 6.11E+04 | 3.25E+04 | 3.60E+04 | 4.11E+04 | 5.08E+04 | 6.67E+04 | 3.35E+04 | 4.28E+04 | 4.12E+04 | 2.74E+04 | 4.33E+04 | ||
B | 均值 | 9.28E+06 | 3.55E+06 | 8.78E+06 | 5.74E+06 | 5.64E+06 | 5.79E+06 | 4.81E+06 | 7.26E+06 | 3.55E+06 | 4.63E+06 | 5.90E+06 | |
标准差 | 2.82E+06 | 7.32E+05 | 2.40E+06 | 2.10E+06 | 1.47E+06 | 2.05E+06 | 1.51E+06 | 2.13E+06 | 1.40E+06 | 9.03E+05 | 1.75E+06 | ||
C | 均值 | 1.14E+07 | 2.00E+06 | 9.60E+06 | 6.23E+06 | 4.48E+06 | 6.25E+06 | 2.80E+06 | 7.75E+06 | 3.22E+06 | 3.04E+06 | 5.68E+06 | |
标准差 | 2.46E+05 | 1.67E+06 | 3.57E+05 | 1.20E+06 | 2.76E+06 | 2.20E+05 | 2.67E+06 | 2.13E+06 | 1.32E+06 | 2.10E+06 | 1.47E+06 | ||
第 2 阶 段 | A | 均值 | 2.74E+08 | 2.30E+08 | 2.00E+08 | 1.91E+08 | 1.96E+08 | 1.99E+08 | 2.36E+08 | 2.44E+08 | 2.25E+08 | 2.60E+08 | 2.26E+08 |
标准差 | 1.16E+07 | 7.32E+06 | 7.81E+06 | 6.64E+06 | 8.89E+06 | 1.20E+07 | 9.34E+06 | 9.06E+06 | 1.14E+07 | 1.16E+07 | 9.57E+06 | ||
B | 均值 | 5.90E+07 | 4.94E+07 | 1.84E+07 | 3.13E+07 | 3.33E+07 | 3.15E+07 | 6.52E+07 | 4.73E+07 | 4.88E+07 | 7.36E+07 | 4.58E+07 | |
标准差 | 7.19E+07 | 6.62E+07 | 4.22E+07 | 4.29E+07 | 5.25E+07 | 5.02E+07 | 7.08E+07 | 6.76E+07 | 6.00E+07 | 7.47E+07 | 5.99E+07 | ||
C | 均值 | 1.43E+08 | 1.26E+08 | 8.91E+07 | 9.37E+07 | 9.18E+07 | 9.48E+07 | 1.20E+08 | 1.27E+08 | 1.18E+08 | 1.41E+08 | 1.14E+08 | |
标准差 | 2.13E+07 | 1.81E+07 | 1.71E+07 | 1.15E+07 | 1.47E+07 | 1.33E+07 | 1.51E+07 | 2.08E+07 | 1.89E+07 | 2.19E+07 | 1.73E+07 | ||
第 3 阶 段 | A | 均值 | 8.93E+09 | 6.62E+09 | 1.04E+10 | 6.75E+09 | 6.81E+09 | 7.03E+09 | 5.84E+09 | 5.45E+09 | 5.17E+09 | 6.89E+09 | 6.99E+09 |
标准差 | 6.17E+08 | 7.98E+08 | 6.15E+08 | 5.83E+08 | 7.30E+08 | 6.93E+08 | 1.17E+09 | 1.13E+09 | 1.06E+09 | 7.16E+08 | 8.11E+08 | ||
B | 均值 | 1.92E+09 | 1.09E+09 | 1.03E+09 | 7.44E+08 | 1.17E+09 | 1.48E+09 | 6.92E+08 | 7.04E+08 | 5.14E+08 | 7.62E+08 | 1.01E+09 | |
标准差 | 2.39E+09 | 1.50E+09 | 2.22E+09 | 1.36E+09 | 1.89E+09 | 2.17E+09 | 1.25E+09 | 1.37E+09 | 1.24E+09 | 1.30E+09 | 1.67E+09 | ||
C | 均值 | 4.21E+08 | 4.17E+08 | 9.05E+07 | 4.29E+08 | 4.87E+08 | 7.27E+08 | 9.91E+08 | 1.34E+09 | 7.08E+08 | 5.54E+08 | 6.16E+08 | |
标准差 | 7.44E+08 | 6.45E+08 | 4.96E+08 | 6.80E+08 | 5.30E+08 | 7.60E+08 | 7.80E+08 | 6.36+8 | 6.04E+08 | 6.71E+08 | 6.57E+08 |
阶段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 4.49E+07 | 2.97E+07 | 5.35E+07 | 5.66E+07 | 5.88E+07 | 7.85E+07 | 8.73E+07 | 8.37E+07 | 4.71E+07 | 6.67E+07 | 6.07E+07 |
标准差 | 8.55E+06 | 9.93E+05 | 1.11E+06 | 2.01E+06 | 1.91E+06 | 1.25E+06 | 1.89E+06 | 1.95E+06 | 2.09E+06 | 1.69E+06 | 2.34E+06 | ||
B | 均值 | 9.54E+03 | 0 | 0 | 5.53E+02 | 3.36E+05 | 1.86E+05 | 0 | 0 | 6.74E+04 | 4.10E+05 | 9.15E+04 | |
标准差 | 5.23E+04 | 0 | 0 | 3.03E+03 | 1.84E+06 | 7.19E+05 | 0 | 0 | 3.69E+05 | 2.25E+06 | 5.23E+05 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
第 2 阶 段 | A | 均值 | 2.20E+08 | 1.51E+08 | 2.52E+08 | 1.88E+08 | 1.95E+08 | 2.51E+08 | 2.16E+08 | 3.06E+08 | 1.92E+08 | 2.12E+08 | 2.18E+08 |
标准差 | 2.36E+06 | 1.72E+06 | 1.86E+06 | 2.57E+06 | 2.13E+06 | 3.31E+06 | 3.85E+06 | 1.74E+06 | 2.08E+06 | 1.56E+06 | 2.32E+06 | ||
B | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
第 3 阶 段 | A | 均值 | 3.36E+09 | 2.73E+09 | 2.82E+09 | 6.01E+07 | 3.69E+07 | 3.60E+09 | 2.91E+09 | 2.69E+08 | 2.97E+08 | 3.90E+09 | 2.00E+09 |
标准差 | 1.12E+08 | 1.47E+08 | 1.06E+08 | 1.42E+08 | 9.90E+07 | 1.62E+08 | 1.57E+08 | 6.14E+08 | 1.42E+08 | 1.52E+08 | 1.83E+08 | ||
B | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tab. 7 Hypervolume (mean and standard deviation) results of three algorithms in large systems
阶段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 4.49E+07 | 2.97E+07 | 5.35E+07 | 5.66E+07 | 5.88E+07 | 7.85E+07 | 8.73E+07 | 8.37E+07 | 4.71E+07 | 6.67E+07 | 6.07E+07 |
标准差 | 8.55E+06 | 9.93E+05 | 1.11E+06 | 2.01E+06 | 1.91E+06 | 1.25E+06 | 1.89E+06 | 1.95E+06 | 2.09E+06 | 1.69E+06 | 2.34E+06 | ||
B | 均值 | 9.54E+03 | 0 | 0 | 5.53E+02 | 3.36E+05 | 1.86E+05 | 0 | 0 | 6.74E+04 | 4.10E+05 | 9.15E+04 | |
标准差 | 5.23E+04 | 0 | 0 | 3.03E+03 | 1.84E+06 | 7.19E+05 | 0 | 0 | 3.69E+05 | 2.25E+06 | 5.23E+05 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
第 2 阶 段 | A | 均值 | 2.20E+08 | 1.51E+08 | 2.52E+08 | 1.88E+08 | 1.95E+08 | 2.51E+08 | 2.16E+08 | 3.06E+08 | 1.92E+08 | 2.12E+08 | 2.18E+08 |
标准差 | 2.36E+06 | 1.72E+06 | 1.86E+06 | 2.57E+06 | 2.13E+06 | 3.31E+06 | 3.85E+06 | 1.74E+06 | 2.08E+06 | 1.56E+06 | 2.32E+06 | ||
B | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
第 3 阶 段 | A | 均值 | 3.36E+09 | 2.73E+09 | 2.82E+09 | 6.01E+07 | 3.69E+07 | 3.60E+09 | 2.91E+09 | 2.69E+08 | 2.97E+08 | 3.90E+09 | 2.00E+09 |
标准差 | 1.12E+08 | 1.47E+08 | 1.06E+08 | 1.42E+08 | 9.90E+07 | 1.62E+08 | 1.57E+08 | 6.14E+08 | 1.42E+08 | 1.52E+08 | 1.83E+08 | ||
B | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||
C | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
实例 | 第1阶段 | 第2阶段 | 第3阶段 | 实例 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | ||
1 | 7499 | 7 498 | 5 749 | 7500 | 7500 | 1 000 | 7495 | 7 492 | 0 | 7 | 7500 | 7 499 | 5 750 | 7 497 | 7498 | 2 499 | 7495 | 7 494 | 0 |
2 | 7500 | 7 499 | 5 497 | 7499 | 7 498 | 1 500 | 7495 | 7 488 | 0 | 8 | 7500 | 7 499 | 6 250 | 7 497 | 7498 | 1 500 | 7492 | 7 489 | 0 |
3 | 7 499 | 7500 | 6 750 | 7499 | 7499 | 1 248 | 7471 | 6 242 | 0 | 9 | 7 499 | 7500 | 4 997 | 7 498 | 7499 | 1 500 | 7 494 | 7496 | 0 |
4 | 7500 | 7 497 | 5 499 | 7 497 | 7499 | 2 494 | 7494 | 7 488 | 0 | 10 | 7500 | 7 499 | 5 997 | 7499 | 7 497 | 2 498 | 7497 | 7 491 | 0 |
5 | 7499 | 7 498 | 5 749 | 7500 | 7 497 | 1 498 | 7496 | 7 489 | 0 | 平均值 | 7500 | 7 498 | 5 824 | 7498 | 7498 | 1 798 | 7493 | 7 366 | 0 |
6 | 7 498 | 7500 | 6 000 | 7 497 | 7499 | 2 247 | 7497 | 7 491 | 0 |
Tab. 8 Capacity value indicators in complex systems
实例 | 第1阶段 | 第2阶段 | 第3阶段 | 实例 | 第1阶段 | 第2阶段 | 第3阶段 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | |A| | |D| | |E| | ||
1 | 7499 | 7 498 | 5 749 | 7500 | 7500 | 1 000 | 7495 | 7 492 | 0 | 7 | 7500 | 7 499 | 5 750 | 7 497 | 7498 | 2 499 | 7495 | 7 494 | 0 |
2 | 7500 | 7 499 | 5 497 | 7499 | 7 498 | 1 500 | 7495 | 7 488 | 0 | 8 | 7500 | 7 499 | 6 250 | 7 497 | 7498 | 1 500 | 7492 | 7 489 | 0 |
3 | 7 499 | 7500 | 6 750 | 7499 | 7499 | 1 248 | 7471 | 6 242 | 0 | 9 | 7 499 | 7500 | 4 997 | 7 498 | 7499 | 1 500 | 7 494 | 7496 | 0 |
4 | 7500 | 7 497 | 5 499 | 7 497 | 7499 | 2 494 | 7494 | 7 488 | 0 | 10 | 7500 | 7 499 | 5 997 | 7499 | 7 497 | 2 498 | 7497 | 7 491 | 0 |
5 | 7499 | 7 498 | 5 749 | 7500 | 7 497 | 1 498 | 7496 | 7 489 | 0 | 平均值 | 7500 | 7 498 | 5 824 | 7498 | 7498 | 1 798 | 7493 | 7 366 | 0 |
6 | 7 498 | 7500 | 6 000 | 7 497 | 7499 | 2 247 | 7497 | 7 491 | 0 |
实例 | 覆盖值/% | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
第1阶段 | 第2阶段 | 第3阶段 | 第1阶段 | 第2阶段 | 第3阶段 | |||||||
Cv(A,D) | Cv(D,A) | Cv(A,D) | Cv(D,A) | Cv(A,D) | Cv(D,A) | Cv(D,E) | Cv(E,D) | Cv(D,E) | Cv(E,D) | Cv(D,E) | Cv(E,D) | |
平均值 | 100.00 | 0.15 | 99.45 | 0.13 | 99.95 | 0.72 | 99.86 | 4.20 | 100.00 | 0.00 | 100.00 | 0.00 |
1 | 100.00 | 1.47 | 99.27 | 0.00 | 100.00 | 0.00 | 99.81 | 5.19 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 100.00 | 0.00 | 99.61 | 0.00 | 100.00 | 0.01 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
3 | 100.00 | 0.05 | 99.59 | 0.00 | 100.00 | 0.00 | 99.66 | 14.93 | 100.00 | 0.00 | 100.00 | 0.00 |
4 | 100.00 | 0.00 | 99.32 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
5 | 100.00 | 0.00 | 99.32 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
6 | 100.00 | 0.00 | 99.49 | 0.67 | 100.00 | 0.00 | 99.33 | 17.25 | 100.00 | 0.00 | 100.00 | 0.00 |
7 | 100.00 | 0.00 | 99.52 | 0.17 | 99.96 | 1.44 | 100.00 | 0.03 | 100.00 | 0.00 | 100.00 | 0.00 |
8 | 100.00 | 0.00 | 99.36 | 0.00 | 99.91 | 4.55 | 99.81 | 4.11 | 100.00 | 0.00 | 100.00 | 0.00 |
9 | 100.00 | 0.00 | 99.40 | 0.41 | 99.64 | 1.20 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
10 | 100.00 | 0.00 | 99.61 | 0.00 | 100.00 | 0.00 | 99.97 | 0.48 | 100.00 | 0.00 | 100.00 | 0.00 |
Tab. 9 Coverage value indicators in complex systems
实例 | 覆盖值/% | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
第1阶段 | 第2阶段 | 第3阶段 | 第1阶段 | 第2阶段 | 第3阶段 | |||||||
Cv(A,D) | Cv(D,A) | Cv(A,D) | Cv(D,A) | Cv(A,D) | Cv(D,A) | Cv(D,E) | Cv(E,D) | Cv(D,E) | Cv(E,D) | Cv(D,E) | Cv(E,D) | |
平均值 | 100.00 | 0.15 | 99.45 | 0.13 | 99.95 | 0.72 | 99.86 | 4.20 | 100.00 | 0.00 | 100.00 | 0.00 |
1 | 100.00 | 1.47 | 99.27 | 0.00 | 100.00 | 0.00 | 99.81 | 5.19 | 100.00 | 0.00 | 100.00 | 0.00 |
2 | 100.00 | 0.00 | 99.61 | 0.00 | 100.00 | 0.01 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
3 | 100.00 | 0.05 | 99.59 | 0.00 | 100.00 | 0.00 | 99.66 | 14.93 | 100.00 | 0.00 | 100.00 | 0.00 |
4 | 100.00 | 0.00 | 99.32 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
5 | 100.00 | 0.00 | 99.32 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
6 | 100.00 | 0.00 | 99.49 | 0.67 | 100.00 | 0.00 | 99.33 | 17.25 | 100.00 | 0.00 | 100.00 | 0.00 |
7 | 100.00 | 0.00 | 99.52 | 0.17 | 99.96 | 1.44 | 100.00 | 0.03 | 100.00 | 0.00 | 100.00 | 0.00 |
8 | 100.00 | 0.00 | 99.36 | 0.00 | 99.91 | 4.55 | 99.81 | 4.11 | 100.00 | 0.00 | 100.00 | 0.00 |
9 | 100.00 | 0.00 | 99.40 | 0.41 | 99.64 | 1.20 | 100.00 | 0.00 | 100.00 | 0.00 | 100.00 | 0.00 |
10 | 100.00 | 0.00 | 99.61 | 0.00 | 100.00 | 0.00 | 99.97 | 0.48 | 100.00 | 0.00 | 100.00 | 0.00 |
阶 段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 1.33E+07 | 4.54E+06 | 1.13E+07 | 7.84E+06 | 7.60E+06 | 7.72E+06 | 6.71E+06 | 9.99E+06 | 5.04E+06 | 5.77E+06 | 7.98E+06 |
标准差 | 6.11E+04 | 3.25E+04 | 3.60E+04 | 4.11E+04 | 5.08E+04 | 6.67E+04 | 3.35E+04 | 4.28E+04 | 4.12E+04 | 2.74E+04 | 4.33E+04 | ||
D | 均值 | 1.27E+07 | 3.90E+06 | 1.08E+07 | 7.14E+06 | 6.93E+06 | 6.96E+06 | 6.08E+06 | 9.30E+06 | 4.39E+06 | 5.19E+06 | 7.34E+06 | |
标准差 | 4.08E+04 | 3.49E+04 | 8.24E+04 | 5.79E+04 | 2.22E+04 | 6.64E+04 | 3.81E+04 | 3.20E+04 | 4.26E+04 | 2.76E+04 | 4.45E+04 | ||
E | 均值 | 4.21E+06 | 1.07E+06 | 3.91E+06 | 1.94E+06 | 1.61E+06 | 2.07E+06 | 1.65E+06 | 2.62E+06 | 9.85E+06 | 1.55E+06 | 3.05E+06 | |
标准差 | 3.82E+06 | 1.15E+06 | 3.25E+06 | 1.89E+06 | 1.68E+06 | 2.10E+06 | 1.72E+06 | 3.02E+06 | 1.14E+06 | 1.42E+06 | 2.12E+06 | ||
第 2 阶 段 | A | 均值 | 2.74E+08 | 2.30E+08 | 2.00E+08 | 1.91E+08 | 1.96E+08 | 1.99E+08 | 2.36E+08 | 2.44E+08 | 2.25E+08 | 2.60E+08 | 2.26E+08 |
标准差 | 1.16E+07 | 7.32E+06 | 7.81E+06 | 6.64E+06 | 8.89E+06 | 1.20E+07 | 9.34E+06 | 9.06E+06 | 1.14E+07 | 1.16E+07 | 9.57E+06 | ||
D | 均值 | 1.74E+08 | 1.95E+08 | 1.48E+08 | 1.93E+08 | 1.73E+08 | 1.60E+08 | 1.93E+08 | 1.64E+08 | 1.24E+08 | 2.07E+08 | 1.73E+08 | |
标准差 | 1.14E+07 | 7.61E+06 | 8.69E+06 | 9.70E+06 | 7.34E+06 | 9.60E+06 | 1.14E+07 | 9.07E+06 | 9.86E+06 | 1.27E+07 | 9.74E+06 | ||
E | 均值 | 3.11E+06 | 2.12E+06 | 8.39E+06 | 1.46E+06 | 4.20E+06 | 7.53E+06 | 1.24E+06 | 2.24E+06 | 1.49E+06 | 8.92E+06 | 3.53E+06 | |
标准差 | 1.10E+07 | 7.70E+06 | 2.72E+07 | 4.36E+06 | 1.84E+07 | 2.39E+07 | 3.83E+07 | 1.03E+07 | 5.74E+06 | 3.55E+07 | 1.82E+07 | ||
第 3 阶 段 | A | 均值 | 8.93E+09 | 6.62E+09 | 1.04E+10 | 6.75E+09 | 6.81E+09 | 7.03E+09 | 5.84E+09 | 5.45E+09 | 5.17E+09 | 6.89E+09 | 6.99E+09 |
标准差 | 6.17E+08 | 7.98E+08 | 6.15E+08 | 5.83E+08 | 7.30E+08 | 6.93E+08 | 1.17E+09 | 1.13E+09 | 1.06E+09 | 7.16E+08 | 8.11E+08 | ||
D | 均值 | 4.25E+08 | 1.56E+09 | 1.27E+08 | 1.77E+09 | 1.50E+09 | 2.12E+09 | 2.41E+09 | 2.80E+09 | 2.61E+09 | 1.72E+09 | 1.70E+09 | |
标准差 | 1.99E+08 | 4.99E+08 | 9.65E+07 | 4.90E+08 | 5.43E+08 | 5.08E+08 | 6.31E+08 | 7.66E+08 | 6.01E+08 | 5.51E+08 | 4.88E+08 | ||
E | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Tab. 10 Hypervolume (mean and standard deviation) indicators in complex systems
阶 段 | 解集 | 指标 | 实例1 | 实例2 | 实例3 | 实例4 | 实例5 | 实例6 | 实例7 | 实例8 | 实例9 | 实例10 | 平均值 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
第 1 阶 段 | A | 均值 | 1.33E+07 | 4.54E+06 | 1.13E+07 | 7.84E+06 | 7.60E+06 | 7.72E+06 | 6.71E+06 | 9.99E+06 | 5.04E+06 | 5.77E+06 | 7.98E+06 |
标准差 | 6.11E+04 | 3.25E+04 | 3.60E+04 | 4.11E+04 | 5.08E+04 | 6.67E+04 | 3.35E+04 | 4.28E+04 | 4.12E+04 | 2.74E+04 | 4.33E+04 | ||
D | 均值 | 1.27E+07 | 3.90E+06 | 1.08E+07 | 7.14E+06 | 6.93E+06 | 6.96E+06 | 6.08E+06 | 9.30E+06 | 4.39E+06 | 5.19E+06 | 7.34E+06 | |
标准差 | 4.08E+04 | 3.49E+04 | 8.24E+04 | 5.79E+04 | 2.22E+04 | 6.64E+04 | 3.81E+04 | 3.20E+04 | 4.26E+04 | 2.76E+04 | 4.45E+04 | ||
E | 均值 | 4.21E+06 | 1.07E+06 | 3.91E+06 | 1.94E+06 | 1.61E+06 | 2.07E+06 | 1.65E+06 | 2.62E+06 | 9.85E+06 | 1.55E+06 | 3.05E+06 | |
标准差 | 3.82E+06 | 1.15E+06 | 3.25E+06 | 1.89E+06 | 1.68E+06 | 2.10E+06 | 1.72E+06 | 3.02E+06 | 1.14E+06 | 1.42E+06 | 2.12E+06 | ||
第 2 阶 段 | A | 均值 | 2.74E+08 | 2.30E+08 | 2.00E+08 | 1.91E+08 | 1.96E+08 | 1.99E+08 | 2.36E+08 | 2.44E+08 | 2.25E+08 | 2.60E+08 | 2.26E+08 |
标准差 | 1.16E+07 | 7.32E+06 | 7.81E+06 | 6.64E+06 | 8.89E+06 | 1.20E+07 | 9.34E+06 | 9.06E+06 | 1.14E+07 | 1.16E+07 | 9.57E+06 | ||
D | 均值 | 1.74E+08 | 1.95E+08 | 1.48E+08 | 1.93E+08 | 1.73E+08 | 1.60E+08 | 1.93E+08 | 1.64E+08 | 1.24E+08 | 2.07E+08 | 1.73E+08 | |
标准差 | 1.14E+07 | 7.61E+06 | 8.69E+06 | 9.70E+06 | 7.34E+06 | 9.60E+06 | 1.14E+07 | 9.07E+06 | 9.86E+06 | 1.27E+07 | 9.74E+06 | ||
E | 均值 | 3.11E+06 | 2.12E+06 | 8.39E+06 | 1.46E+06 | 4.20E+06 | 7.53E+06 | 1.24E+06 | 2.24E+06 | 1.49E+06 | 8.92E+06 | 3.53E+06 | |
标准差 | 1.10E+07 | 7.70E+06 | 2.72E+07 | 4.36E+06 | 1.84E+07 | 2.39E+07 | 3.83E+07 | 1.03E+07 | 5.74E+06 | 3.55E+07 | 1.82E+07 | ||
第 3 阶 段 | A | 均值 | 8.93E+09 | 6.62E+09 | 1.04E+10 | 6.75E+09 | 6.81E+09 | 7.03E+09 | 5.84E+09 | 5.45E+09 | 5.17E+09 | 6.89E+09 | 6.99E+09 |
标准差 | 6.17E+08 | 7.98E+08 | 6.15E+08 | 5.83E+08 | 7.30E+08 | 6.93E+08 | 1.17E+09 | 1.13E+09 | 1.06E+09 | 7.16E+08 | 8.11E+08 | ||
D | 均值 | 4.25E+08 | 1.56E+09 | 1.27E+08 | 1.77E+09 | 1.50E+09 | 2.12E+09 | 2.41E+09 | 2.80E+09 | 2.61E+09 | 1.72E+09 | 1.70E+09 | |
标准差 | 1.99E+08 | 4.99E+08 | 9.65E+07 | 4.90E+08 | 5.43E+08 | 5.08E+08 | 6.31E+08 | 7.66E+08 | 6.01E+08 | 5.51E+08 | 4.88E+08 | ||
E | 均值 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
标准差 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
1 | PIETRANTUONO R. On the testing resource allocation problem: research trends and perspectives[J]. Journal of Systems and Software, 2020, 161: No.110462. 10.1016/j.jss.2019.110462 |
2 | WANG Z, TANG K, YAO X. A multi-objective approach to testing resource allocation in modular software systems [C]// Proceedings of the 2008 IEEE Congress on Evolutionary Computation (IEEE World Congress on Computational Intelligence). Piscataway: IEEE, 2008: 1148-1153. 10.1109/cec.2008.4630941 |
3 | WANG Z, TANG K, YAO X. Multi-objective approaches to optimal testing resource allocation in modular software systems[J]. IEEE Transactions on Reliability, 2010, 59(3): 563-575. 10.1109/tr.2010.2057310 |
4 | YANG B, HU Y M, HUANG C Y. An architecture-based multi-objective optimization approach to testing resource allocation[J]. IEEE Transactions on Reliability, 2015, 64(1): 497-515. 10.1109/tr.2014.2372411 |
5 | 陆阳,岳峰,张国富,等.串并行软件系统测试资源动态分配建模及求解[J].软件学报, 2016, 27(8): 1964-1977. |
LU Y, YUE F, ZHANG G F, et al. Model and solution to testing resource dynamic allocation for series-parallel software systems[J]. Journal of Software, 2016, 27(8): 1964-1977. | |
6 | ZHANG G F, SU Z P, LI M Q, et al. Constraint handling in NSGA-Ⅱ for solving optimal testing resource allocation problems[J]. IEEE Transactions on Reliability, 2017, 66(4): 1193-1212. 10.1109/tr.2017.2738660 |
7 | PIETRANTUONO R, POTENA P, PECCHIA A, et al. Multiobjective testing resource allocation under uncertainty[J]. IEEE Transactions on Evolutionary Computation, 2018, 22(3): 347-362. 10.1109/tevc.2017.2691060 |
8 | 牛福强,张国富,苏兆品,等.多阶段多目标动态测试资源分配算法[J].计算机工程与设计, 2020, 41(3): 656-663. |
NIU F Q, ZHANG G F, SU Z P, et al. Multi-stage and multi-objective dynamic testing resource allocation algorithm[J]. Computer Engineering and Design, 2020, 41(3): 656-663. | |
9 | 占德志,张国富,苏兆品,等.动态可靠性约束的多阶段测试资源分配研究[J].计算机工程, 2021, 47(2): 246-253, 260. |
ZHAN D Z, ZHANG G F, SU Z P, et al. Research on multi-stage testing resource allocation with dynamic reliability constraints[J]. Computer Engineering, 2021, 47(2): 246-253, 260. | |
10 | KUKKONEN S, LAMPINEN J. GDE3: the third evolution step of generalized differential evolution [C]// Proceedings of the 2005 IEEE Congress on Evolutionary Computation. Piscataway: IEEE, 2005: 443-450. |
11 | PIETRANTUONO R, RUSSO S, TRIVEDI K S. Software reliability and testing time allocation: an architecture-based approach[J]. IEEE Transactions on Software Engineering, 2010, 36(3): 323-337. 10.1109/tse.2010.6 |
12 | 张策,崔刚,刘宏伟,等.构件软件可靠性过程技术[J].计算机学报, 2014, 37(12): 2586-2612. |
ZHANG C, CUI G, LIU H W, et al. Component-based software reliability process technologies[J]. Chinese Journal of Computers, 2014, 37(12): 2586-2612. | |
13 | FIONDELLA L, GOKHALE S S. Optimal allocation of testing effort considering software architecture[J]. IEEE Transactions on Reliability, 2012, 61(2): 580-589. 10.1109/tr.2012.2192016 |
14 | GOEL A L, OKUMOTO K. Time-dependent error-detection rate model for software reliability and other performance measures[J]. IEEE Transactions on Reliability, 1979, R-28(3): 206-211. 10.1109/tr.1979.5220566 |
15 | ZITZLER E, THIELE L. Multiobjective optimization using evolutionary algorithms — a comparative case study [C]// Proceedings of the 1998 International Conference on Parallel Problem Solving from Nature, LNCS 1498. Berlin: Springer, 1998: 292-301. |
16 | ALMERING V, van GENUCHTEN M, CLOUDT G, et al. Using software reliability growth models in practice[J]. IEEE Software, 2007, 24(6): 82-88. 10.1109/ms.2007.182 |
17 | XIE M, YANG B. A study of the effect of imperfect debugging on software development cost[J]. IEEE Transactions on Software Engineering, 2003, 29(5): 471-473. 10.1109/tse.2003.1199075 |
18 | KIMURA M, TOYOTA T, YAMADA S. Economic analysis of software release problems with warranty cost and reliability requirement[J]. Reliability Engineering and System Safety, 1999, 66(1): 49-55. 10.1016/s0951-8320(99)00020-4 |
19 | ZEEPHONGSEKUL P, JAYASINGHE C L, FIONDELLA L, et al. Maximum-likelihood estimation of parameters of NHPP software reliability models using expectation conditional maximization algorithm[J]. IEEE Transactions on Reliability, 2016, 65(3): 1571-1583. 10.1109/tr.2016.2570557 |
20 | DEB K, PRATAP A, AGARWAL S, et al. A fast and elitist multiobjective genetic algorithm: NSGA-Ⅱ[J]. IEEE Transactions on Evolutionary Computation, 2002, 6(2): 182-197. 10.1109/4235.996017 |
21 | 邵志胜,张国富,苏兆品,等.基于软件体系结构和广义差分进化的测试资源动态分配算法[J].计算机应用, 2021, 41(12): 3692-3701. |
SHAO Z S, ZHANG G F, SU Z P, et al. Dynamic testing resource allocation algorithm based on software architecture and generalized differential evolution[J]. Journal of Computer Applications, 2021, 41(12): 3692-3701. | |
22 | ZITZLER E, THIELE L. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach[J]. IEEE Transactions on Evolutionary Computation, 1999, 3(4): 257-271. 10.1109/4235.797969 |
23 | LI M Q, YAO X. Quality evaluation of solution sets in multiobjective optimisation: a survey[J]. ACM Computing Surveys, 2019, 52(2): No.26. 10.1145/3300148 |
24 | LI M Q, CHEN T, YAO X. How to evaluate solutions in Pareto-based search-based software engineering? a critical review and methodological guidance[J]. IEEE Transactions on Software Engineering, 2022, 48(5): 1771-1799. 10.1109/tse.2020.3036108 |
25 | D A van VELDHUIZEN, LAMONT G B. On measuring multiobjective evolutionary algorithm performance [C]// Proceedings of the 2000 IEEE Congress on Evolutionary Computation — Volume 1. Piscataway: IEEE, 2000: 204-211. |
[1] | Xiao CHEN, Yan CHANG, Danchen WANG, Shibin ZHANG. Low-cost adversarial example defense algorithm based on example preprocessing [J]. Journal of Computer Applications, 2024, 44(9): 2756-2762. |
[2] | Ye TIAN, Jinjin CHEN, Xingyi ZHANG. Hybrid optimizer combining evolutionary computation and gradient descent for constrained multi-objective optimization [J]. Journal of Computer Applications, 2024, 44(5): 1386-1392. |
[3] | Weipeng JING, Qingxin XIAO, Hui LUO. Channel compensation algorithm for speaker recognition based on probabilistic spherical discriminant analysis [J]. Journal of Computer Applications, 2024, 44(2): 556-562. |
[4] | Saijuan XU, Zhenyu PEI, Jiawei LIN, Genggeng LIU. Constrained multi-objective evolutionary algorithm based on multi-stage search [J]. Journal of Computer Applications, 2023, 43(8): 2345-2351. |
[5] | Xiang GUO, Wengang JIANG, Yuhang WANG. Encrypted traffic classification method based on improved Inception-ResNet [J]. Journal of Computer Applications, 2023, 43(8): 2471-2476. |
[6] | Yu WANG, Tianjun REN, Zilin FAN. Air combat maneuver decision-making of unmanned aerial vehicle based on guided Minimax-DDQN [J]. Journal of Computer Applications, 2023, 43(8): 2636-2643. |
[7] | Zhiqiang CHEN, Meng HAN, Hongxin WU, Muhang LI, Xilong ZHANG. Multi-stage weighted concept drift detection method [J]. Journal of Computer Applications, 2023, 43(3): 776-784. |
[8] | Guihui CHEN, Jinyu LIN, Yuehua LI, Zhongbing LI, Yuli WEI, Kai LU. Multi-stage low-illuminance image enhancement network based on attention mechanism [J]. Journal of Computer Applications, 2023, 43(2): 552-559. |
[9] | LIU Yongmin, YANG Yujin, LUO Haoyi, HUANG Hao, XIE Tieqiang. Intrusion detection method for wireless sensor network based on bidirectional circulation generative adversarial network [J]. Journal of Computer Applications, 2023, 43(1): 160-168. |
[10] | Wenting BI, Haitao LIN, Liqun ZHANG. Moving target defense decision-making algorithm based on multi-stage evolutionary signal game model [J]. Journal of Computer Applications, 2022, 42(9): 2780-2787. |
[11] | Tingping ZHANG, Cong SHUAI, Jianxi YANG, Junzhi ZOU, Chaoshun YU, Lifang DU. Re-identification of vehicles based on joint stripe relations [J]. Journal of Computer Applications, 2022, 42(6): 1884-1891. |
[12] | Fangxin NIE, Yujia WANG, Xin JIA. Teaching and learning information interactive particle swarm optimization algorithm [J]. Journal of Computer Applications, 2022, 42(3): 874-882. |
[13] | Yaoming MA, Yu ZHANG. Insulator detection algorithm based on improved Faster-RCNN [J]. Journal of Computer Applications, 2022, 42(2): 631-637. |
[14] | GAN Lan, SHEN Hongfei, WANG Yao, ZHANG Yuejin. Data augmentation method based on improved deep convolutional generative adversarial networks [J]. Journal of Computer Applications, 2021, 41(5): 1305-1313. |
[15] | JIANG Kaolin, BAI Wei, ZHANG Lei, CHEN Jun, PAN Zhisong, GUO Shize. Malicious code detection based on multi-channel image deep learning [J]. Journal of Computer Applications, 2021, 41(4): 1142-1147. |
Viewed | ||||||
Full text |
|
|||||
Abstract |
|
|||||